Laserfiche WebLink
j. Curb&gutter, sidewalks, driveways and wheelchai r ramps, property fences, <br /> trees within the right of way. <br /> 2. Consultant shall prepare the topographic base maps and shal be completed in <br /> AUTOCAD capable of plotting at scale of 1"=20'. Text information and other <br /> entities shall be readable at this scale when plotted on a plan and profile <br /> sheet. Final plotted text height shall be 0.1". <br /> 3. Consultant shall set street center line stations at every 50 feet on tangent and <br /> 25 feet stations on curves. Survey station shall be at the center of the street at <br /> 50 feet intervals, beginning at centerline of street intersections or manholes unless <br /> otherwise noted on the project area map (see attached map). Consultant shall <br /> indicate spot elevations at each 50 foot station, center line, and lip of gutter or <br /> edge of pavement, face of curb at flow line, back of curb, sidewalk, planting strip <br /> or landscape area and right-of-way line or property line. <br /> 4. Consultant shall extend base map topographic survey 25 feet beyond <br /> centerline of end manholes and shall extend 50 feet beyond street intersections <br /> in all possible directions unless otherwise noted. (See attached map). Sunrey <br /> stationing 1+00 shall start at center�ine of street intersection or centerline of <br /> manholes unless otherwise noted. Location map with notations of recommended <br /> starting point of Station is attached. <br /> 5. Consultant shall use Redwood City Datum in preparing the topographic survey. <br /> The City will provide the location of the nearest benchmark. Benchmark <br /> information used shall be noted on the topographic survey. Consultant shall use <br /> North American Vertical Datum of 1988 (NAVD88). <br /> 6. Consultant shall use the City's standard legend for drafting annotations. <br /> 7. The City shall request As-Built/Record Drawings from utility companies <br /> (Comcast, PG&E, AT&T, Astound, Pacific Bell, South Bayside System Authority, <br /> MCI, Cal water and RCN). The City shall provide the as-builUrecord drawings <br /> to the consultant for inclusion in the survey base map. If additional as- <br /> built/record drawings are required to complete the base map, consultant shall <br /> obtain records from corresponding utility companies. <br /> PROJECT SCHEDULE: <br /> Consultant shall complete the work within ninety (90) calendar days after receiving <br /> written authorization, the Notice to Proceed (NTP). <br /> REV:06-05-14 VR <br /> Page 10 of 18 <br /> ATTY/AGR.2014.089/Sandis,Civil Engineers,Surveyors, Planners <br />