Laserfiche WebLink
EXHIBIT "C" <br /> SCHEDULE OF HOME IMPROVEMENTS <br /> Year 1: <br /> 1. Rood over front porch to be patched <br /> 2. Fix the grading under gutter spouts <br /> Year 2: • <br /> 1. Repair dry rot at bottom of the pillars of the front porch <br /> 2. Seal and paint open spaces on outside of the house <br /> Year 3: <br /> 1. Bathroom exhaust vent to be installed through the roof <br /> • <br /> 2. Remove non-operating lines on the side of the house <br /> 3. Original windows need to be sealed <br /> Year 4: <br /> 1. Restore dressing room window <br /> 2. Replace bay window by kitchen sink <br /> Optional work at the discretion of the homeowner <br /> Investigating replication/installation of original sill and apron of the windows. <br /> • <br /> • <br /> ATTY/AGR/2011.130/1842 WHIPPLE MILLS ACT CONTRACT Page 9 of 9 <br /> REV:12/06/11 <br />