My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt14 Green Charge Networks and PG&E - 750 Marshall
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2014
>
Agmt14 Under 60K
>
Agmt14 Green Charge Networks and PG&E - 750 Marshall
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2014 12:25:45 PM
Creation date
8/13/2014 12:25:42 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Green Charge Networks LLC and PG&E
PROJECT NAME
DC Fast chargers at 750 Marshall St. Generation Agmt and Interconection Agmt
RMP File Number
304.5
Date
6/16/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PACIFIC GAS AND ELECTRIC COMPANY <br /> GENERATING FACILITY INTERCONNECTION AGREEMENT <br /> (3� PARTY NON-EXPORTING) <br /> 2.3 The Gross Nameplate Rating of the Generating Facility is 30 kW. <br /> 2.4 The Net Nameplate Rating of the Generating Facility is 28.95 kW. <br /> 2.5 The annual energy production of the Generating Facility is expected to be <br /> kW h. <br /> 2.6 The Generating Facility's expected date of Initial Operation is 05/16/2014 <br /> The expected date of Initial Operation shall be within two years of the date of this <br /> Agreement. <br /> 2.7 For the purpose of securing certain tariff charge exemptions available under the <br /> California Public Utilities Code (PU Code), Producer hereby declares that the <br /> Generating Facility: <br /> (a) ❑does / �1 does not meet the requirements for Cogeneration as such term is <br /> used in Section 218.5 of the PU Code. <br /> (b) ❑does / ❑ does not meet the requirements for Distributed Energy Resource <br /> Generation as such term is used in Section 353.1 of the PU Code. <br /> 3. DOCUMENTS INCLUDED <br /> This Agreement includes the following exhibits,which are specifically incorporated herein and <br /> made a part of this Agreement. <br /> Appendix A- Description of Generating Facility and Single-Line Diagram <br /> (Supplied by Producer). <br /> Appendix B- A Copy of PG&E's Agreement for Installation of Allocation of Special Facilities <br /> for Parallel Operation of Nonutility-Owned Generation and/or Electrical <br /> Standby Service(Form 79-280, Special Facility Agreemen� (If applicable, <br /> and formed by the parties). <br /> Appendix C- Producer's warranty that the Generating Facility meets the requirements for a <br /> Cogeneration facility pursuant to Section 218.5 of the Public Utilities Code <br /> (when applicable). <br /> Appendix D - Producer's warranty that the Generating Facility meets the requirements for <br /> Distributed Energy Resources Generation as defined in Section 353.1 of the <br /> Public Utilities Code (When applicable). <br /> Form 79-988 <br /> Automated Document,Preliminary Statement Part A Advice 4110-E <br /> Revised September 2012 <br /> Page 2 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.