My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-08-25 Closed and Joint with SA and Planning Amended
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-08-25 Closed and Joint with SA and Planning Amended
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2014 8:47:58 AM
Creation date
8/21/2014 4:01:12 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
8/25/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.1.B. - Page 25 <br /> EXEBBIT C <br /> Bio-retention Area Maintenance Plan for <br /> Primrose School <br /> Project Address and Cross Streets: 2808/2826 El Camino Real.Redwood City.CA 94061 <br /> Assessor's Parcel No.: 059-172-070370,380 <br /> Property Owner: Fountain Square Development West,LLC <br /> Designated Contact: Billy Shields Phone No.: (858)748-0201 <br /> Mailing Address: 12701 Treeridge Terrace.Poway,CA 92064 <br /> The property contains 12 bio-retention areas, located as described below and as shown in the attached <br /> "Exhibit B". <br /> • Bio-retention Area No.1 is located at the south end of the site. <br /> • Bio-retention Area No.2 is located southwest of the new building. <br /> • Bio-retention Area No.3 is located northwest of the new building. <br /> • Bio-retention Area No.4 is located north of the new building. <br /> • Bio-retention Area No.5 is located northeast of the new building. <br /> • Bio-retention Area No.6 is located at the north corner of the courtyard area. <br /> • Bio-retention Area No.7 is located at the east corner of the courtyard area. <br /> • Bio-retention Area No.8 is located south of the new building. <br /> • Bio-retention Area No.9 is located southeast of the new building. <br /> • Bio-retention Area No.10 is located east of the new building. <br /> • Bio-retention Area No.11 is located at the west corner of the courtyard area. <br /> • Bio-retention Area No.12 is located at middle of the courtyard area. <br /> I. Routine Maintenance Activities <br /> The principal maintenance objective is to prevent sediment buildup and clogging,which reduces pollutant <br /> removal efficiency and may lead to bio-retention area failure. Routine maintenance activities, and the <br /> frequency at which they will be conducted,are shown in Table 1. <br /> Table 1 <br /> Routine Maintenance Activities for Bin-retention Areas <br /> No. Maintenance Task Frequency of Task <br /> 1 Remove obstructions,debris and trash from bio-retention area Monthly,or as needed after storm events <br /> and dispose of properly. <br /> 2 Inspect bio-retention area to ensure that it drains between Monthly,or as needed after storm events <br /> storms and within five days after rainfall. <br /> 3 Inspect inlets for channels,soil exposure or other evidence of Monthly,or as needed after storm events <br /> erosion.Clear obstructions and remove sediment. <br /> 4 Remove and replace all dead and diseased vegetation. Twice a year <br /> REV: 07-22-14 VR <br /> Page 11 of 26 <br /> ATTY/AGR.2014.129/FSDW-Redwood City LLC (2808 ECR)_STMMA <br />
The URL can be used to link to this page
Your browser does not support the video tag.