My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-08-25 Closed and Joint with SA and Planning Amended
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-08-25 Closed and Joint with SA and Planning Amended
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2014 8:47:58 AM
Creation date
8/21/2014 4:01:12 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
8/25/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.1.B. - Page 38 <br /> Kensington Assisted Living <br /> Redwood City <br /> Bio-retention Area No.10 <br /> Inspection and Maintenance Checklist <br /> Property Address:2808/2826 El Camino Real.Redwood City,CA 94061 Property Owner:Fountain Square Development West,LLC <br /> Treatment Measure No.: Date of Inspection: Type of Inspection: I Monthly I Pre-Wet Season <br /> After heavy runoff 7 End of Wet Season <br /> Inspector(s): :Other: <br /> Defect Conditions When Maintenance Is Maintename Comments(Describe maintenance completed Results Expected When <br /> Needed Needed?(YIN) and if needed maintenance was not conducted. Maintenance Is Performed <br /> note when it will be done) <br /> 1.Standing Water When water stands in the bio-retention There should be no areas of standing <br /> area between storms and does not drain water once inflow has ceased.Any of <br /> within five days after rainfall. the following may apply sediment or <br /> trash blockages removed,improved <br /> grade from head to foot of bio- <br /> retention area,or added underdrains. <br /> 2.Trash and Debris Trash and debris accumulated in the No- Trash and debris removed from bio- <br /> Accumulation retention area. retention area and disposed of <br /> properly. <br /> 3.Sediment Evidence of sedimentation in bio- Material removed so that there is no <br /> retention area. clogging or blockage.Material is <br /> disposed of properly. <br /> 4.Erosion Charnels have formed around inlets, Obstructions and sediment removed so <br /> there are areas of bare soil,and/or other that water flows freely and disperses <br /> evidence of erosion. over a wide area.Obstructions and <br /> sediment are disposed of properly. <br /> 5.Vegetation Vegetation is dead,diseased and/or Vegetation is healthy and attractive in <br /> overgrown appearance. <br /> 6.Mulch Mulch is missing or patchy in All bare earth is covered,except <br /> appearance.Areas of bare earth are mulch is kept 6 inches away from <br /> exposed,or mulch layer is less than 3 trunks of trees and shrubs.Mulch is <br /> inches in depth. even in appearance,at a depth of 3 <br /> inches. <br /> 7.Miscellaneous Any condition not covered above that Meet the design specifications. <br /> needs attention in order for the bio- <br /> retention area to flotation as designed <br /> REV: 07-22-14 VR <br /> Page 24 of 26 <br /> ATTY/AGR.2014.129/FSDW-Redwood City LLC (2808 ECR)_STMMA <br />
The URL can be used to link to this page
Your browser does not support the video tag.