My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-08-25 Closed and Joint with SA and Planning Amended
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-08-25 Closed and Joint with SA and Planning Amended
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2014 8:47:58 AM
Creation date
8/21/2014 4:01:12 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
8/25/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.1.E. - Page 2 <br /> streets are shown on the attached Project Location Maps. <br /> Three (3) bids were received for the 2013-2014 Asphalt Rubber Chip Seal and Spot <br /> Repair Project by the bid deadline on July 31, 2014. The bid amounts are summarized <br /> in the table below. <br /> Bidder Bid Amount <br /> Granite Rock Company $1,370,273.48 <br /> G. Bortolotto & Co. Inc. $1,410,399.39 <br /> O'Grady Paving, Inc. $1,414,260.10 <br /> Engineer's Estimate $1,401 ,170.00 <br /> The low bid was determined based on the Total Base Bid. The total base bid of <br /> $1,370,273.48 from Granite Rock Company is approximately 2% lower than the <br /> engineer's estimate of $1,401 ,170.00 for the cost of construction. Based upon the bids <br /> received, staff believes that the low bid of $1,370,273.48 is reasonable and responsive, <br /> and recommends awarding the contract to Granite Rock Company. <br /> Construction is anticipated to begin in late September or early October 2014, and <br /> conclude in November 2014. Notification of the proposed work will be mailed to area <br /> residents, property owners, business owners, and schools in early September 2014. <br /> The contractor is required to distribute additional notice 14 days in advance of the start <br /> of work in their immediate area. Updates on the progress of construction will be <br /> available on the city's website. <br /> ALTERNATIVES <br /> Council may choose not to award the construction contract and direct staff to redesign <br /> and/or rebid this project. <br /> FISCAL IMPACT <br /> Funds for Street Pavement Management Programs have been previously approved and <br /> appropriated with an available balance of $1 ,320,715.25 in the Transportation Fund and <br /> $1,571 ,117.87 in the Gas Tax Construction Fund, as of June 30, 2014. <br /> ENVIRONMENTAL REVIEW <br /> As the lead agency, City of Redwood City has determined that the 2013-2014 Asphalt <br /> Rubber Chip Seal and Spot Repair Project meets the CEQA exemption criteria as set <br /> forth in Section 15301 , ("Existing Facilities"). Furthermore, this project has been <br /> designed complaint with the city's Engineering Standards and accepted practices. <br />
The URL can be used to link to this page
Your browser does not support the video tag.