My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc 2014-081417 ROW Improvement - 353 and 355 Alameda de las Pulgas
RedwoodCity
>
City Clerk
>
Recorded Docs CC&Rs
>
Recorded Docs 2013-2020 Additional sub folders
>
Recorded Documents 2013-2023 (additional sub folders)
>
Improvement Agreement
>
RecDoc 2014-081417 ROW Improvement - 353 and 355 Alameda de las Pulgas
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2014 12:18:24 PM
Creation date
9/9/2014 2:54:44 PM
Metadata
Fields
Template:
Recorded Docs
Subject
Sidewalk and Right-of-Way Improvement Agreement
Doc Num
2014-081417
Rec Date
9/9/2014
APN
058-252-110 and 058-252-100
Address
353 and 355 Alameda de las Pulgas
Parties
Ricky Hung Ngo and Yung Le
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit B ' <br /> . <br /> Engineer's Estimate <br /> Street Improvements Alameda De Las Pulgas <br /> June 16,2014 <br /> Item No. Description of Item Quantity Unit Unit Price Item Cost <br /> Mobilization,Demobilization,Trafic Control, <br /> 1 Construction Layout,Notification&Incidentals 1 LS $ 15,000 $ 15,000 <br /> (Maximum 5%of the Total Base Bid,Items 3 through <br /> 16) <br /> Z Demolition(Maximum 3%of the Total Base Bid,Items 1 LS $ 9,000 $ 9,000 <br /> 3 through 16) <br /> 3 Concrete Curb and Gutter(Includes 2'of deep lift g00 LF $ 35 $ 28,000 <br /> asphalt in Street) <br /> 4 Concrete Sidewalk 3200 SF $ 25 $ 80,000 <br /> 5 Reconstruct Driveway-Concrete 1300 SF $ 35 $ 45,500 <br /> 6 Reconstruct Driveway-Asphalt 600 SF $ 30 $ 18,000 <br /> 7 Reconstruct Driveway-Pavers 550 SF $ 40 $ 22,000 <br /> 8 Adjust Water Meter to Finished Grade 3 EA $ 450 $ 1,350 <br /> 9 1"Water Meter 7 EA $ 500 $ 3,500 <br /> 10 1 1/2"Water Meter&Service 2 EA $ 2,000 $ 4,000 <br /> 11 Catch Basin 3 EA $ 4,500 $ 13,500 <br /> 12 12"RCP pipe 45 LF $ 250 $ 11,250 <br /> 13 4"SS Lateral w/Cleanout 2 EA $ 2,400 $ 4,800 <br /> 14 Import&Grading 600 SF $ SO $ 30,000 <br /> 15 3'Fence&Small Retaining Wall 370 LF $ 100 $ 37,000 <br /> 16 6'Fence 32 LF $ 45 $ 1,440 <br /> Total for Section: $ 324,340 <br /> 10%contigency: $ 32,434 <br /> Total plus Contigency: $ 356,774 <br /> Desi�n Costs <br /> 1 Survey $ 7,500 <br /> 2 Design Drawings(10%)of Project Cost $ 32,400 <br /> 3 Right-of-Way dedication $ 5,000 <br /> Total: $ 44,900 <br /> Total,Design&Construction: $ 401,674 <br /> Page 15 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.