My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt14 Wilsey Ham
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2014
>
Agmt14 Wilsey Ham
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2014 10:21:56 AM
Creation date
9/10/2014 10:21:54 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Wilsey Ham
PROJECT NAME
Consulting on engineering and construction services Sanitary Sewer Pump Station Rehab Project Marina P.S. P.S. # 17, P.S. # 19
RMP File Number
304
Date
9/10/2014
MO Ref
14-139
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TASK 4—FINAL DESIGN (100% DESIGN SUBMITTAL) <br /> With the City's approval, the Consultant shall proceed with the Final Design. <br /> Specific tasks in this phase include, but are not limited to, the following: <br /> 1. Incorporate 75% Design Submittal review comments. <br /> 2. Prepare 100% Design Submittal consisting of complete construction <br /> documents including drawings, specifications and cost estimates. The <br /> submittal shall also include, but not limited to, site grading plan, cross- <br /> section details, structural details, complete technical specifications, <br /> estimate of construction cost, electrical details, civil details, structural <br /> details, mechanical details, and any catalogue cuts for any special <br /> material proposed for use in the project. <br /> 3. The 100% Design Submittal shall be ready for signature and submitted to <br /> the City for review and approval. A marked set will be returned along <br /> with staff's comments and/or request for clarifications for revision. <br /> Deliverables: <br /> Consultant shall furnish one (1) set of full-size plans (24"x36" plan sheets) and <br /> specifications for the project. The City will provide the City's standard title block. <br /> The Contract Document set shall bear the responsible engineer's wet stamp and <br /> signature with a license expiration date. Consultant shall also furnish an <br /> electronic copy of the drawings in AutoCAD (version 2013 or earlier) and in PDF <br /> format, specifications in Word, cost estimate, and probable construction <br /> schedule in Excel. <br /> TASK 5—BID SUPPORT AND CONSTRUCTION SERVICES <br /> The following services shall be provided during the bidding process and <br /> construction phase of the project. <br /> 1. Provide design clarification responses during bid phase. <br /> 2. Attend and conduct pre-bid meeting. Respond to questions from <br /> prospective bidders. Assist in issuing addenda, as directed by the City. <br /> 3. Conduct three (3) site visits during construction at appropriate stages. <br /> 4. Attend and conduct pre-construction meeting. <br /> 5. Review shop drawings submittals (25), change order requests (5), <br /> requests for information (10), and provide written recommendations to <br /> the City. <br /> 6. Participate in the final inspection and assist with punch list of deficiencies. <br /> 7. Prepare "As-Built" drawings based on construction field notes and limited <br /> field review by the Consultant. <br /> REV:08-20-14 VR <br /> Page 13 of i6 <br /> ATTY/AGR.2014.155/WILSEY HAM <br />
The URL can be used to link to this page
Your browser does not support the video tag.