Laserfiche WebLink
  <br /> <br /> www.silveradocontractors.com <br />Macy's Mainplace, Santa Ana CA <br />Project consisted of a complete gut out of a <br />140,000 square foot, 3 story Macy's store to <br />make way for new tenants. <br />Disney Music Frank G. Wells 1st & 5th <br />Floors, Burbank, CA <br />Project consisted of a complete gut out of all <br />interiors, including an elevated concrete slab and <br />steel stair case. All work was performed in an <br />occupied building. <br />Veterans Commons, San Francisco, CA <br />Project consisted of structural excavation work in the <br />basement level, structural prep work throughout the <br />14 story building, removal of mechanical systems as <br />well as exterior window removal. <br />7.1.D. - Page 54