7.3.B. - Page 58 <br /> Documentation: <br /> a. & b. The Downtown Precise Plan program EIR (pp. 12 -17 and 12 -18) concluded that development occurring in <br /> conformance with the DTPP would be consistent with the Bay Area Air Quality .Management District (BAAQMD) <br /> 2010 Clean Air Plan control measures and the BAAQMD Air Quality Guidelines, because projected new vehicle <br /> trips resulting under the DTPP would be less than the projected rate of population growth. Therefore, the impact of <br /> the DTPP was considered to be less than significant, and no mitigations were required. The proposed project is in <br /> compliance with all applicable DTPP regulations, and as a result, no additional air quality impacts are anticipated. <br /> c. The Downtown Precise Plan program EIR identified carbon monoxide (CO) as the pollutant of greatest concern in <br /> the Bay Area region. CO levels in the Bay Area are well below ambient air quality standards, and there have been <br /> no exceedances of CO standards in the Bay Area since 1991. However, localized high concentrations of CO can <br /> occur near busy congested intersections. According to the BAAQMD screening methodology, DTPP buildout would <br /> not cause traffic volumes at affected intersections to exceed CO thresholds, and the impact of development resulting <br /> from the DTPP would be less than significant; therefore, no mitigations were required. (EIR p. 12 -18) The <br /> proposed project is in compliance with all applicable DTPP regulations, and as a result, no additional criteria air <br /> pollutant impacts are anticipated. <br /> d. The DTPP program EIR (pp. 12 -18 through 12 -20) concluded that development in accordance with the DTPP <br /> regulations would expose sensitive receptors to toxic air contaminants (TACs) and particulates (PM if located <br /> within 500 feet of Veterans Boulevard, El Camino Real, or the Caltrain railroad. The approximate distances from <br /> the project site to these facilities are as follows: Veterans Boulevard- -2,375 feet; El Camino Real -350 feet; and <br /> the Caltrain railroad -- adjacent. Because the project site is adjacent to the Caltrain railroad and less than 500 feet <br /> from El Camino Real, Downtown Precise Plan program EIR Mitigation 12 -1 shall be required as a condition of <br /> project approval and would reduce the impact to a less- than - significant level. <br /> Mitigation 12 -1 requires residential projects within 500 feet of sources of TACs and particulates (e.g., Caltrain, El <br /> Camino Real) to include an analysis of potential health risks. Based on the extent of such risks, the project shall <br /> incorporate design and construction features (e.g., increased air filtration incorporated into the Hi AC system) that <br /> reduce potential exposure of persons to pollutants in accordance with BAAQMD adopted standards for control of <br /> odor /toxics for sensitive receptors. These features shall include all applicable and feasible mitigations included in <br /> section 5.4 (Mitigating Local Community Risk and Hazard Impacts) of the BAAQMD CEQA Guidelines (May 2011) <br /> subject to approval of the City of Redwood City Community Development Department. One BAAQMD- suggested <br /> performance standard that can be applied is that the project ventilation system should be certified to remove at least <br /> 85 percent of ambient PM2.5 concentrations from indoor areas. <br /> e. There would be no food service businesses included within the project. As part of standard project review, <br /> equipment used for outdoor food preparation (courtyard, roof deck) and the outdoor fireplace (courtyard) would be <br /> subject to City approval for safety and odor control. Furthermore, the project would accommodate refuse and <br /> recycling in enclosed trash rooms on each residential floor and the lower /street level of the project garage (Plan <br /> Sheets A -1.1, A -1.3 through A -1.8; 07.24.2014). Refuse and recycling pick -up would be provided by a local waste <br /> service provider (Recology) and would occur on a weekly basis. No odor impacts are anticipated as a result of the <br /> project. <br /> Summaiv of Impacts <br /> Potentially Less than Significant Less than <br /> Significant With Mitigation Significant No <br /> Impact Incorporated Impact Impact <br /> IZ . BIOLOGIC .:%L RESOURCES — Would the project <br /> a) Have a substantial adverse effect, either directly or through habitat X <br /> modifications, on any species identified as a candidate, sensitive, or special <br /> status species in local or regional plans, policies, or regulations, or by the <br /> California Department of Fish and Game or U.S. Fish and Wildlife Service? <br /> b) Have a substantial adverse effect on any riparian habitat or other sensitive X <br /> natural community identified in local or regional plans, policies, regulations or <br /> by the California Department of Fish and Game or U.S. Fish and Wildlife <br /> Service? <br /> 9 <br />