Laserfiche WebLink
7.3.B. - Page 62 <br /> (Mitigation of Impacts of Development on Properties that Contain Historic Resources which may be Altered, <br /> Relocated, or Removed). These standards are those described above and are identical to program EIR Mitigation <br /> 7 -2. <br /> In addition to DTPP program EIR Mitigation 7 -2 and the DTPP guideline regarding relocation, the four <br /> recommendations described above shall be required as conditions of approval for the project. <br /> b. & d. The proposed project would not cause a potentially significant impact to any known archaeological resources in <br /> the project vicinity. However, the Downtown Precise Plan program EIR (pp. 7 -33 through 7 -35) concluded that <br /> there is a high potential for new development facilitated by the DTPP to disturb unrecorded archaeological <br /> resources, which represented a potentially significant impact. Mitigation 7 -1 of the Downtown Precise Plan <br /> program EIR requires that in the event that any deposit of prehistoric or historic archaeological materials are <br /> encountered during project construction activities, all work within an appropriate buffer area shall be stopped and <br /> a qualified archaeologist meeting Federal criteria under 36 CFR 61 be contacted to assess the deposit and make <br /> recommendations, possibly including complete avoidance of the resources, in place preservation, and /or data <br /> recovery. This measure, which shall be required as a condition of approval for the project, would reduce the <br /> potential impacts of the project on archaeological resources to a less - than - significant level. <br /> c. The proposed project would not cause a potentially significant impact to any known paleontological resources in the <br /> project vicinity. However, the Downtown Precise Plan program EIR (p. 7 -41) concluded that earthmoving activity <br /> associated with DTPP facilitated development could potentially disrupt, alter, or eliminate as yet undiscovered <br /> paleontological resources, which represented a potentially significant impact. Mitigation 7 -5 of the Downtown <br /> Precise Plan program EIR requires that prior to the issuance of grading or demolition permits, the Planning, <br /> Housing, and Economic Development Department (now the Community Development Department), in coordination <br /> with a qualified paleontologist, assess individual development proposals for the potential to destroy unique <br /> paleontological resources and to determine provisions to protect such resources when applicable, possibly <br /> including complete avoidance of the resources, in place preservation, and/or data recovery as detailed in Mitigation <br /> 7 -1. This measure, which shall be required as a condition of approval for the project, would reduce the potential <br /> impacts of the project on paleontological resources to a less- than - significant level. <br /> e. The proposed project would not cause a potentially significant impact to any known cemeteries or human remains in <br /> the project vicinity (DTPP EIR p. 7 -7). However, should any human remains be found during on- or off-site <br /> improvements associated with the proposed project, the City of Redwood City Cultural Resources Management Plan <br /> guidelines and EIR Mitigation 7 -1 require that construction activities be halted immediately and the County coroner <br /> and a professional archaeologist be consulted to evaluate the significance of the find. If the remains are Native <br /> American, the Native American Heritage Commission is required to be notified. These measures, which shall be <br /> required as conditions of approval for the project, would reduce the potential impacts of the project on human <br /> remains to a less - than - significant level. <br /> Summai:y of Impacts <br /> Potentially Less than Significant Less than <br /> Significant With Mitigation Significant No <br /> Impact Incorporated Impact Impact <br /> VI. GEOLOGY AND SOILS — R ould ihe project <br /> a) Expose people or structures to potential substantial adverse effects, including <br /> the risk of loss, injury, or death involving: <br /> The project would not create new geologic hazards that could damage project <br /> or nearby facilities. Therefore, this section focuses on the effect of local <br /> geologic conditions and activity on the proposed project. <br /> i) Rupture of a known earthquake fault, as delineated on the most recent X <br /> Alquist - Priolo Earthquake Fault Zoning Map issued by the State <br /> Geologist for the area or based on other substantial evidence of a known <br /> fault (Division of Mines and Geology Special Publication 42)? <br /> ii) Strong seismic ground shaking? X <br /> iii) Seismic - related ground failure, including liquefaction? X <br /> iv) Landslides? X <br /> b) Result in substantial soil erosion or the loss of topsoil? X <br /> 13 <br />