Laserfiche WebLink
7.3.B. - Page 68 <br /> These uniformly applicable policies, standards, and regulations would adequately assure that possible health and <br /> safety impacts related to exposure to existing hazardous materials contamination would be less than significant. <br /> e. & f The subject property is located within San Carlos Airport Influence Area B. The Airport Land Use Commission <br /> (ALUC) and City /County Association of Governments (CiCAG) reviewed the DTPP prior to its adoption and found <br /> that its goals, objectives, policies, and development criteria were consistent with the San Carlos Airport Land Use <br /> Plan (DTPP program EIR pp. 14 -16 and 14 -17). The proposed project complies with all development criteria (e.g., <br /> height, building disposition) in the DTPP. Also, there are no other public airports, public use airports, or private <br /> airstrips within two miles. Therefore, implementation of the proposed project would not result in a safety hazard for <br /> people residing or working in the project vicinity. <br /> g. The project design would be required to comply with all applicable City codes and regulations pertaining to <br /> emergency access, as well as fire protection and security. For example, the EVA lane on the site's eastern edge <br /> would be 20 to 28 feet wide and extend the length of the building to accommodate City fire apparatus. In addition, <br /> (1) the entire building would include a sprinkler system; (2) the fire control room would be located in the main <br /> lobby on Franklin Street; (3) all gates, including at walkways and garages, would include coded keypad entries for <br /> emergency access; (4) maps would be mounted at entry gates for rapid orientation while responding to <br /> emergencies; (5) project design would implement the following: <br /> Fire Department Access: <br /> 1. Both stairways will continue to the roof with door access to the roof (One stair required by Code) <br /> 2. A clear path across the roof between the stairs for firefighters' access will be provided. Guardrails will be <br /> provided where the walkway is within 10 feet (horizontally) of the interior court as required by CBC Section 1013.7. <br /> 3. All three elevators will be gurney size. (One required by Code.) <br /> 4. A graphic fire alarm annunciator showing alarm conditions will be installed in a lobby determined to be the fire <br /> department response point. (An annunciator is not required by Code) <br /> 5. Standpipe outlets will be provided in the enclosed stairs, at the horizontal stair and central courtyard. Two outlets <br /> will be provided in the courtyard with each being individually gated double outlets. A minimum 4 -inch supply piping <br /> will be provided to the standpipes. Standpipes will be manual wet. <br /> To limit fire size: <br /> 1. The sprinkler system will be an NFPA 13 system. <br /> 2. The project will include three fire walls dividing the building into three sections. Fire walls will be 3 -hour. One of <br /> the fire walls will be horizontal exit with standpipes on both sides of the cross corridor doors. <br /> To improve exiting: <br /> 1. All stairs with discharge directly to the exterior (not 500/0 to lobby as allowed by Code). <br /> 2. A fire safety diagram showing building layout, exit locations, and other fire safety features will be posted in a <br /> conspicuous location on each floor. <br /> In addition, DTPP program EIR Mitigation 8 -1 requires the City to implement signal detectors at selected <br /> intersections as needed over time to provide priority tragic signal timing for emergency response vehicles; this <br /> program is underway. As a result of the above discussion, the proposed project would not impair or interfere with <br /> emergency plans, and the impact is considered less than significant. <br /> h. The project site is located in a Downtown urban environment not adjacent to wildlands and therefore would not <br /> expose people or structures to a significant risk of loss, injury, or death involving wildland fares. <br /> Summary of Impacts <br /> Potentially Less than Significant Less than <br /> Significant With Mitigation Significant No <br /> Impact Incorporated Impact Impact <br /> IX. HYDROLOGY AND WATER QUALITY -- Would the project <br /> a) Violate any water quality standards or waste discharge requirements? X <br /> b) Substantially deplete groundwater supplies or interfere substantially with X <br /> 19 <br />