My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt14 Guerra Construction Group - 2014 Jardin De Ninos Park Renovation
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2014
>
Agmt14 Guerra Construction Group - 2014 Jardin De Ninos Park Renovation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2015 9:28:46 AM
Creation date
10/8/2014 10:54:12 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Guerra Construction Group
PROJECT NAME
2014 Jardin De Ninos Park Renovation
Date
9/30/2014
MO Ref
14-136
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
IV. CITY'S ENGINEER AND REPRESENTATIVES <br /> Reserved <br /> V. CONTRACTOR'S REPRESENTATIONS AND WARRANTIES <br /> In order to induce City to enter into this Agreement, Contractor makes the following <br /> representations and warranties: <br /> A. Contractor has visited the Site and has examined thoroughly and understood <br /> the nature and extent of the Work, Site, locality, actual conditions, as built <br /> conditions, and all local conditions and federal, state and local laws and <br /> regulations that in any manner may affect cost, progress, performance or <br /> furnishing of Work or which relate to any aspect of the design and the <br /> means, methods, techniques, sequences or procedures of construction to be <br /> employed by Contractor and safety precautions and programs incident <br /> thereto. <br /> B. Contractor has examined thoroughly and understood all reports of <br /> exploration and tests of subsurface conditions, drawings or reports, available <br /> for design and construction purposes, of physical conditions, or which may <br /> be apparent at the Site and accepts the determination set forth in these <br /> Sections and Section 00700 (General Conditions) of the limited extent of the <br /> information contained in these Sections upon which the Contractor may be <br /> entitled to rely. Contractor agrees that except for the information so <br /> identified, Contractor does not and shall not rely on any other information <br /> contained in these Sections. <br /> C. Contractor has considered the physical conditions at or contiguous to the <br /> Site or otherwise which may affect the cost, progress, performance or <br /> furnishing of Work, as Contractor considers necessary for the performance <br /> or furnishing of Work at the Contract Sum, within the Contract Time and in <br /> accordance with the other terms and conditions of Contract documents, <br /> including specifically the provisions of the General Conditions. <br /> VI. CONTRACT DOCUMENTS <br /> The Contract documents which comprise the entire agreement between City and <br /> Contractor concerning the Work consist of the following: <br /> A. Contract documents consist of the following Sections, including all changes, <br /> addenda and modifications thereto, as listed on Section 00010 (Table of <br /> Contents): <br /> Section 00430 Subcontractors List Form <br /> Section 00481 Non-Collusion Affidavit <br /> Section 00482 Bidder Certifications <br /> Section 00520 Agreement <br /> Section 00550 Notice to Proceed <br /> Section 00610 Faithful Performance Bond <br /> Section 00620 Construction Labor and Material Payment Bond <br /> 2014 Jardin De Ninos Park Renovation Project 00520-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.