My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-10-20 Closed and Special Joint with SA_Revised_10_17_2014
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-10-20 Closed and Special Joint with SA_Revised_10_17_2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2014 2:13:26 PM
Creation date
10/16/2014 4:39:00 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
10/20/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.A. - Page 102 <br /> Section 4: Evaluation of Environmental Impacts <br /> the existing treatment plants. Furthermore, residential development is not subject to point- source discharge <br /> requirements. The project will not impact compliance with RWQCB treatment requirements. Future housing <br /> development will not interfere with compliance with RWQCB wastewater treatment requirements. <br /> The proposed Housing Element does not change any applicable land use designations and does not <br /> propose or anticipate any specific development proposals. Thus, no impact will occur. <br /> b) Less than Significant Impact. The Housing Element is a General Plan policy document that addresses <br /> housing need in the City; no actual development or rezoning /re- designation of land is proposed as part of the <br /> Housing Element. As such, adoption of the Housing Element, by itself, would not generate water or <br /> wastewater. Future development constructed pursuant to General Plan and Housing Element policy will <br /> incrementally increase water demand and wastewater discharges. Wastewater treatment for Redwood City <br /> is provided by the SBSA treatment plant, located at the northeastern end of the Redwood Shores peninsula. <br /> SBSA operates under a joint powers authority (JPA) with four member agencies: the cities of Redwood City, <br /> Belmont, and San Carlos, and the West Bay Sanitation District (serving Menlo Park, Atherton, Portola Valley, <br /> and parts of East Palo Alto and San Mateo County). <br /> The City Public Works Department is responsible for operation and maintenance of the sanitary sewer <br /> collection system serving Redwood City. The system consists of approximately 280 miles of sewer mains, <br /> along with 31 sewer lift stations. Improvements to the wastewater collection pipelines are ongoing, with <br /> continual updates and replacements to the existing system. The SBSA treatment plant has an operating <br /> capacity of 29 million gallons per day (mgd) average dry weather flow (ADWF). The plant is permitted by the <br /> RWQCB to discharge 29 mgd ADWF into San Francisco Bay. The current permitted peak wet weather <br /> capacity of the SBSA facility is 71 mgd. Redwood City has been allocated about 13.8 mgd of average dry <br /> weather capacity at the SBSA treatment facility. Based on the per capita wastewater generation rate of 70 <br /> gpd assumed for the 2008 SBSA flow study, the total estimated average dry weather flow for the City in 2030 <br /> will be 8.17 mgd, which is well below the City's allocation of 13.8 mgd. <br /> To ensure that both existing and future water system infrastructure needs are met, General Plan Program BE- <br /> 134 calls for the preparation of a Water Master Plan that will include recommendations to ensure the long <br /> term viability of the system in light of any anticipated capacity changes, as well as to ensure reliability of the <br /> system during seismic events. According to the City, the Water Master Plan will include a capital improvement <br /> program as well as an integrated seismic improvement program. Further, Policy NR -3.1 requires new <br /> development to fund its fair -share costs associated with the provision of water service, which will help ensure <br /> that adequate funding is available to implement the capital improvement program. As the need for new or <br /> upgraded water infrastructure is identified through the Water Master Plan and CIP, those projects will undergo <br /> their own environmental review at the time they are authorized for design and construction. With the General <br /> Plan programs implemented, the proposed Housing Element will not require or result in the construction of <br /> new water or wastewater treatment facilities or expansion of existing facilities. Impacts will be less than <br /> significant. <br /> General Plan Building Environment Element Programs <br /> Program BE -134 Water Master Plan. Consider completing a Water Master Plan that includes <br /> recommendations to improve water distribution capacity and utilize water demand <br /> assumptions from future UWMPs and the General Plan. <br /> General Plan Natural Resources Element Policies <br /> 31 City of Redwood City General Plan EIR, Land Use and Planning. 2010. <br /> 32 City of Redwood City General Plan EIR. Utilities. 2010. <br /> Redwood City Housing Element Initial Study 63 <br />
The URL can be used to link to this page
Your browser does not support the video tag.