My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-10-20 Closed and Special Joint with SA_Revised_10_17_2014
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-10-20 Closed and Special Joint with SA_Revised_10_17_2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2014 2:13:26 PM
Creation date
10/16/2014 4:39:00 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
10/20/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.1.C. - Page 49 <br /> Exhibit C - Inspection and Maintenance Checklist <br /> Manufactured Stormwater Treatment Measure Maintenance Plan for <br /> Palacio Apartments <br /> September 2014 <br /> Manufactured Stormwater Treatment Measures are PROPRIETARY treatment devices that tend to <br /> be installed below ground and operate using some type of proprietary filter media, hydrodynamic <br /> separation, or sedimentation and screening. Common examples of manufactured treatment <br /> measures include manufactured media filters, inlet filters or drain inserts, oil /water separators and <br /> hydrodynamic separators. In August 2004, the Regional Water Board's Executive Office wrote a <br /> letter stating that a project relying on inlet filters or oil /water separators as the sole treatment <br /> measure would be unlikely to meet the maximum extent practicable standard of the National <br /> Polutant Discharge Elimination System Permit. See the Countywide C.3 Technical Guidance <br /> (www.flowstobay.orq) for more information. <br /> Project Address: 488 Winslow Street , Redwood City, CA <br /> Assessor's Parcel No.: 052 - 334 -060, 052 - 334 -070, 052 - 334 - 080,052- 334 -130, & 140 <br /> Property Owner: Acclaim Properties Phone No.: 650 - 324 -9400 <br /> Designated Contact: Mark Johnson Phone No.: 650- 324 -9439 <br /> Mailing Address: 125 Willow Road, Menlo Park, CA 94025 <br /> The property contains 2 , Contech StormFilter located as described below and as shown <br /> in the attached site plan'. <br /> • Stormwater Treatment Unit No.1 is a catchbasin unit located at the Southerly end of the <br /> property within the driveway. <br /> • Stormwater Treatment Unit No.2 is a manhole unit located at the Northerly corner of the <br /> property . <br /> • <br /> Routine Maintenance Activities <br /> The principal maintenance objective is to prevent sediment buildup and clogging, which <br /> reduces pollutant removal efficiency and may lead to failure of the manufactured treatment <br /> measure. Routine maintenance activities, and the frequency at which they will be <br /> conducted, are shown in Table 1. <br /> Table 1 <br /> Routine Maintenance Activities for Manufactured Treatment Measures <br /> No. Maintenance Task Frequency of Task <br /> 1 Inspect for standing water, sediment, trash and debris. Monthly during rainy season <br /> 2 Remove sediment, trash and debris from sedimentation As needed <br /> basin, riser pipe and filter bed, using vactor truck method. <br /> Dispose of sediment, trash, filters and debris properly. <br /> 3 Ensure that manufactured treatment measure drains After major storm events and as <br /> completely within five days. needed. <br /> 4 Inspect outlets to ensure proper drainage. Monthly during rainy season, or as <br /> needed after storm events <br /> 5 Follow manufacturer's guidelines for maintenance and As per manufacturer's specifications. <br /> cartridge replacement. <br /> Attached site plan must match the site plan exhibit to Maintenance Agreement. <br /> ri IMLEts Pallma 0161 ,mGl,9r....Etrse4t,�.,,l.146 .10(11d Page 1 NDS Approved 12/5/07 <br /> ATTY /AGR.2014.186 /Fuller Street Partners - 601 Brewster - Palacio Apartments STMMA <br /> Page 10 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.