My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-11-17 Special Joint with SA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-11-17 Special Joint with SA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2014 1:54:52 PM
Creation date
11/13/2014 1:49:28 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Special
Agency Type
City Council and Successor Agency
Date
11/17/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.1.A. - Page 3 <br /> FISCAL IMPACT <br /> Funds for this project were previously appropriated as Water Fund Capital Projects — <br /> Distribution System Replacement Program, and Water Bond Projects Fund — Recycled <br /> Water System Development and Recycled Water Main Extension — Kaiser Contribution, <br /> which have available balances of $1,577,426.99 and $554,307.75 and $1,005,750.00 <br /> respectively <br /> ENVIRONMENTAL REVIEW <br /> The topographic surveys proposed in this report do not constitute a project as defined <br /> by the California Environmental Quality Act. As we proceed to the construction phase <br /> of the program, environmental reviews will be performed on each construction package. <br /> HARRIS SIDDIQUI <br /> PROJECT ENGINEER <br /> AARON AKNIN <br /> COMMUNITY DEVELOPMENT DIRECTOR <br /> FOR ROBERT B. BELL <br /> CITY MANAGER <br /> ATTACHMENT <br /> - Agreement <br />
The URL can be used to link to this page
Your browser does not support the video tag.