Laserfiche WebLink
7.1.A. - Page 15 <br /> Beech Street Marshall Street to 300 100 Broadway <br /> Broadway <br /> Beech Street to Chestnut St, <br /> Broadway 2 250 200 <br /> Woodside Road 2, Woodside Rd <br /> Sub -total 7,350 850 <br /> 1. Walnut Street topographic survey shall include ditch and weeded area around the existing utility <br /> tunnel. (Unpaved area between the cul -de -sac and 101 fence. <br /> 2. Survey shall cross Woodside and extend 100 feet past Woodside. <br /> 3. Streets may be switched from one phase to another or removed completely from the survey to fit City <br /> budget and design & construction schedule by the City Engineer. <br /> 1 TOTAL ESTIMATED LENGTH FOR PHASE I, II & 2A 25,775 LF <br /> LEVEL OF EFFORT <br /> WATERMAIN PHASE I <br /> Street and Limits Personnel Hours <br /> Principal Survey Project Survey CAD Drafter <br /> Crew Surveyor Technician <br /> Whipple ADLP to Turnsworth 1 13 7 1.5 25 <br /> Avenue <br /> Arlington Turnsworth to Wellesley 4 46 24 5 86 <br /> Road Crescent <br /> Durlston Arlington to Blanford 1 13 7 1.5 25 <br /> Road <br /> Blanford Turnsworth to Melrose 2 19 10 2 36 <br /> Blvd. <br /> TOTAL 8 91 48 10 172 <br /> REV: 10 -06 -14 VR <br /> ATTY /AGRI2014.204 /MACLEOD & ASSOCIATES INC. Page 12 of 18 <br />