achieve each milestone listed above and Substantial and Final <br /> Completion, until such date as contractor achieves each milestone <br /> listed above and Substantial and Final Completion. <br /> C. Liquidated Damaaes Amounts <br /> 1. Milestone A.1. ------ $100.00 per Day <br /> 2. Milestone A.2. -------$100.00 per Day <br /> 3. Milestone A.3. -------$100.00 per Day <br /> 4. Milestone A.4. -------$500.00 per Day <br /> 5. Substantial Completion (A.S.) -------$1,500.00 per Day <br /> 6. Final Completion (A.6.) ------ $1,000.00 per Day <br /> C. Liquidated damages for delay shall only cover and be in lieu of the actual <br /> damages suffered by City as a result of delay referenced above. Liquidated <br /> damages shall not cover the cost of completion of the Work, damages <br /> resulting from defective work, cost of temporary replacement facilities, <br /> damages suffered by others who then seek to recover their damages from <br /> City (for example, delay claims of other contractors or subcontractors), and <br /> defense costs thereof. <br /> IV. CITY'S ENGINEER AND REPRESENTATIVES <br /> Reserved <br /> V. CONTRACTOR'S REPRESENTATIONS AND WARRANTIES <br /> In order to induce City to enter into this Agreement, Contractor makes the following <br /> representations and warranties: <br /> A. Contractor has visited the Site and has examined thoroughly and understood <br /> the nature and extent of the Work, Site, locality, actual conditions, as built <br /> conditions, and all local conditions and federal, state and local laws and <br /> regulations that in any manner may affect cost, progress, performance or <br /> furnishing of Work or which relate to any aspect of the design and the <br /> means, methods, techniques, sequences or procedures of construction to be <br /> employed by Contractor and safety precautions and programs incident <br /> thereto. <br /> B. Contractor has examined thoroughly and understood all reports of <br /> exploration and tests of subsurface conditions, drawings or reports, available <br /> for design and construction purposes, of physical conditions, or which may <br /> be apparent at the Site and accepts the determination set forth in these <br /> Sections and Section 00700 (General Conditions) of the limited extent of the <br /> information contained in these Sections upon which the Contractor may be <br /> entitled to rely. Contractor agrees that except for the information so <br /> identified, Contractor does not and shall not rely on any other information <br /> MAIN STREET DOG AGILITY PARK <br />