My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt15 CDM Smith Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2015
>
Agmt15 Under 60K
>
Agmt15 CDM Smith Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2015 9:01:23 AM
Creation date
1/12/2015 11:08:51 AM
Metadata
Fields
Template:
Agreement
Contractor Name
CDM Smith Inc.
PROJECT NAME
Meet and Develop Draft RFP for parking technology/equipment upgrade parking mangement plan
RMP File Number
304.5
Date
1/9/2015
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT "A" <br /> SCOPE OF SERVICES AND FEE <br /> Task A. Kick-off/Scoping Meeting <br /> The CDM Smith Team will meet with Redwood City staff including: Public Works, IT, finance <br /> (revenue services), PD/enforcement. The purpose of this meeting will be to: <br /> Confirm technology/equipment types and services to be included in the procurement (using the <br /> parking management plan as a baseline); and <br /> Develop a list of desired performance standards per equipment type and service. <br /> The intent is the meeting or meetings with these departments will happen during one on-site <br /> visit. Any follow up discussion determined necessary will occur via conference call with Redwood <br /> City staff. <br /> Deliverables for this task will include an agenda, example PARC RFPs for review and action <br /> items for follow up. <br /> Task B. Develop the Draft PARC Request for Proposals (RFP) <br /> CDM Smith will develop a draft RFP for PARC equipment upgrade based on the results of Task <br /> A and recommendations from the 2014 parking management plan. This includes detailed <br /> performance standards based on the City's needs as defined in Task A. The RFP will be based <br /> on the City's RFP template and will request that respondents provide a solution that includes an <br /> upgrade to the city's existing garage PARCs that meets the required performance standards and <br /> that are compatible with the PARCs installed at the Crossing 900 Project. <br /> Task C. Finalize RFP <br /> CDM Smith will finalize the RFP based on comments provided by City Staff. Up to finro rounds of <br /> review and comments by the City are assumed. <br /> Fee Schedule <br /> CDM Smith will charge the standard hourly rates for services listed in the fee schedule below <br /> and for direct expenses as incurred. Total compensation for services will not exceed Eight <br /> Thousand Nine Hundred Forty Seven Dollars ($8,947). <br /> CDM Smith <br /> Job Title Hourl Rate <br /> Pro'ect Director $321 <br /> Trans ortation Planner $181 <br /> ATTY/AGR/2015/AMENDMENTS/AMEND N0.1 CDM SMITH INC. <br /> REV:03-18-15 VR <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.