My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2015-01-26 Special and Joint SA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2015
>
AgdaPkt 2015-01-26 Special and Joint SA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2015 3:05:39 PM
Creation date
1/22/2015 12:16:38 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
1/26/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
245
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.1.B. - Page 9 <br /> 4. Completion Date. Developer will complete the Work within one year of the Effective <br /> Date. All Work will be good completed in ood and workmanlike manner in accordance with accepted <br /> p <br /> design and construction practices and consistent with the Improvement Plans. This completion date may <br /> be extended by the City Engineer in his or her sole and absolute discretion at the request of Developer, <br /> which request shall be accompanied by a written assurance acceptable to the City Engineer that the <br /> securities required by Section 13 shall remain enforceable throughout the term of the extension. <br /> 5. Estimated Cost of Work. The engineer's estimated cost of the Work is One Hundred Two <br /> Thousand,Two Hundred Seventy Dollars($102,270.00)("Estimated Cost of Work"). <br /> 6. Modifications to the Plans. Approval of this Agreement by City does not release <br /> Developer of its responsibility to correct mistakes, errors or omissions in the Improvement Plans. If, at <br /> any time, in the opinion of the City Engineer, in his reasonable discretion, the Improvement Plans are <br /> deemed inadequate in any respect, Developer agrees to make such modifications,changes or revisions as <br /> necessary in order to complete the Work in a good and workmanlike manner in accordance with accepted <br /> design and construction standards and consistent with the Conditions and Improvement Plans. <br /> 7. Repairs. Developer agrees to repair or have repaired in a timely manner at its sole cost <br /> and expense all public roads, streets, or other public or private property damaged as a result of or <br /> incidental to the Work or in connection with the development of the Property, or to pay to the property <br /> owner of any damaged road, street or property the full cost of such repair. In addition, Developer shall <br /> obtain the written acceptance of such repair or payment from any owner whose private or public property <br /> was repaired by Developer or to whom Developer has paid the full cost of such repair in accordance with <br /> this Section 7. City shall be under no obligation whatsoever to accept the Work completed under this <br /> Agreement until such time as all repairs have been completed or have been paid for and written <br /> acceptances have been provided to the City Engineer. <br /> 8. Foreman or Superintendent. Developer shall give personal attention to the Work. A <br /> competent foreman or superintendent, satisfactory to the City Engineer in his reasonable discretion with <br /> authority to act for and on behalf of Developer, shall be named in writing by Developer prior to <br /> commencement of the Work, shall be present on the Property during the performance of the Work and <br /> may not be changed without advance notification to and the concurrence of the City Engineer. <br /> 9. Examination of Work. All of the Work shall be consistent with the Improvement Plans <br /> and performed to the satisfaction of the City Engineer, in his reasonable discretion. City and its <br /> authorized agents shall,at all times during the performance of the Work,have free access to the Property <br /> and the Work and shall be allowed to examine the Work and all materials used and to be used in the <br /> Work. <br /> 10. City Costs; Deposit. Developer shall pay to City the actual cost for all engineering, <br /> inspection, administration, plan check, laboratory and field testing, construction, and other services <br /> furnished by City in connection with this Agreement, including those performed by consultants under <br /> contract with City ("City Costs"). Developer shall deposit with City the sum of Ten Thousand and <br /> No/100 Dollars ($10,000.00) ("Deposit") to compensate City for all City Costs. Developer understands <br /> that the Deposit is an estimate and further agrees to pay to City the actual cost of providing such services, <br /> in accordance with the City's current fees. Developer agrees to complete payment of such additional sum <br /> or sums for the services provided by City, if any, within ten (10) days after billing by City of the <br /> additional sum to be paid and agrees that the amount payable shall be increased by ten percent(10%) in <br /> the event payment is not made within such ten(10)day period. Any part of the Deposit or such additional <br /> sum or sums not utilized by City shall be returned promptly to Developer. <br /> REV:11-06-14 VR <br /> Page 3 of 18 <br /> ATTYIAGR.2014.2441Rossi Lane Improvement Agreement <br />
The URL can be used to link to this page
Your browser does not support the video tag.