My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Ord 2410
RedwoodCity
>
City Clerk
>
Ordinances
>
2010-2019
>
2015
>
Ord 2410
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2015 2:53:02 PM
Creation date
1/28/2015 2:53:01 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Ordinance
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
1/26/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
01/26/2015 <br /> Section 3. Chapter 41, Article IV, Section 41.15 is hereby amended to read as <br /> follows: <br /> "Sec. 41.15 DUTIES AND RESPONSIBILITIES OF THE FLOODPLAIN <br /> ADMINISTRATOR: <br /> The duties and responsibilities of the Floodplain Administrator shall include, but <br /> not be limited to, the following: <br /> A. Permit Review. Review all development permits to determine that: <br /> 1. Permit requirements of this Chapter have been satisfied; <br /> 2. All other required State and Federal permits have been obtained; <br /> 3. The site is reasonably safe from flooding; and <br /> 4. The proposed development does not adversely affect the carrying <br /> capacity of areas where base flood elevations have been determined <br /> but a floodway has not been designated. For purposes of this Chapter, <br /> "adversely affects" means that the cumulative effect of the proposed <br /> development when combined with all other existing and anticipated <br /> development will increase the water surFace elevation of the base flood <br /> more than one foot at any point. <br /> 5. All Letters of Map Revision (LOMR's) for flood control projects are <br /> �proved prior to the issuance of building permits. Buildinq Permits <br /> must not be issued based on Conditional Letters of Map Revision <br /> jCLOMR's). A�proved CLOMR's allow construction of the proposed <br /> flood control project and land preparation as specified in the "start of <br /> construction"definition. <br /> [The text of subsections B. through C. remain unchanged.] <br /> D. Documentation of Floodplain Development. Obtain and maintain for public <br /> inspection and make available as needed the following: <br /> 1. Certification required by Section 41.�18(C) (1) (lowest floor <br /> elevations). <br /> 2. Certification required by Section 41.�18(C) (2) (elevation or <br /> floodproofing of nonresidential structures). <br /> 3. Certification of elevation required by Section 41.�18(C) (3) (wet <br /> floodproofing standard). <br /> ATTY/ORD.407/FLOODPLAIN MANAGEMENT ORDINANCE ORD.#2410 <br /> REV:12-16-14 VR FORMERLY MUFF#506 <br /> Page 2 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.