Laserfiche WebLink
<br />" " ,. - <br /> .J I <br /> Attachment 'A' <br /> to the Water Supply Assessment for <br /> BAYSIDE GARDENS <br /> Projected Water Demand <br /> Date: 12/08/2003 <br /> Prepared by BKF Engineers <br /> vva er Unit iO ai <br /> Number Persons/Unit Demand Demand <br /> Residential of Units (Per RWC) (GPCO) (GPO) <br /> 1 Bedroom 270 1.60 80 34,560 <br /> 2 Bedroom 295 2.50 80 59,000 <br /> ITotals I 565 I I 93,560 I <br /> <br /> water Unit <br /> Demand <br /> (GPO/SF) <br /> or <br /> Rooms (GPO/Room) Total <br /> Area or or Demand <br /> Commercial (SF) Seats (GPO/Seat) (GPO) <br /> Leasinç¡ Office 3,150 0.13 410 <br /> Club House 3,400 0.13 442 <br /> Retail 4,300 0.13 559 <br /> Restaurant 4,000 125 30 3,750 <br /> ITotals I 14,850 I I 5,161 I <br /> Ilrrigation (140,000 SF@0.0717 GPD/SF)' I I <br /> 10,042 <br /> I I I <br /> Total 108,762 <br /> . Irrigation based on the foiiowing conversion <br /> 3.5 cu It of water/sq It of iandscape per year x 7.48 gal/cu It x 1 year/365 days <br /> Onsite Existing Water Demand (from 1999 Meter Readings) <br /> Century Park 12 Theater I 16,457 I <br /> <br />BKF Engineers Page 2 of 2 <br />