My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt04 Bayside Gardens - Water
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2004
>
Agmt04 Bayside Gardens - Water
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:45:33 PM
Creation date
5/10/2004 9:04:45 AM
Metadata
Fields
Template:
Agreement
PROJECT NAME
Bayside Gardens - Water supply assessment
RMP File Number
802
Date
1/26/2004
MO Ref
04-13
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />il I . " - - <br /> - <br />'I <br />. , <br />. Table ES.1: RcIcommended Project (Altematlve D) CapItal Cost SUmmary <br />I Item DeIlc:rIDtiOn COIIt <br /> 1 StDraaaand Sl:a.ndbv Potable Cónnedlans $ 5,704000 <br /> 2 PunlOIl1t> $ 1 320000 <br />II 3 Transmlasion Pioeline S 15.248,000 <br /> 4 SceclaJCroâslnas bv Jack and Bore $: - <br /> 5 TrtlStment FaciIIt1es S 1 6~,OOO <br />18 Subtotal Facll1jòs S 23 908.000 <br /> 6 SeIVk:Ø()Qnnec:tlånS and Ret«fflt 110% of Fec:ilUês CosO $: 2.391000 <br /> Subtòtal Facllllles.& Connsotions $: 26;299'000 <br />. Enalnellllnll.CM end Admini$tretion (20%\ $ 5260000 <br /> ConUnnencv/20%\ S 5.260.000 <br /> TOTAl. $: 36,819.000 <br />I <br />. ES.5 Implementation Strategy <br /> The basic implementation slI:at8gy for Alternative Dwater supply and capllalimprovernent <br />. program rssumma~ In Table ES-2. The Implementation concept [s to simultaneously build <br /> backbone infrastructurefacilroes such as lres.1menl, pumping, storege and tr¡¡nsmîsslon <br /> pipelines, While .aggressively preparing In detail for customer COnnections and site retrofit <br />. Baædon the experiences of other Bay area projects, customer coordination and site retrofit <br /> requirement!¡ are typically underestimated, and aclual recyCled water use haS fallen short of <br /> origlnal projections. <br />. The proposed project could be implemented in mull/pie phases. Treatment, stornge, pumping, <br /> and pipeline lransmfssjoo facilities to serve the Redwood .ShOrfls N'EI<!I could be <Xíl\Structed in <br /> fiscal year (f'Y) 200312004. ai'ld customerseMC«i and site retroliis could be constructed over a <br />. three-yesr period between 2003 and 2006,80 flJlI supply ben$f1ts ¡¡re obtained during the 2007 <br /> irrigation $eason. The Greater Bayfronl Area projec;t phase mey be driven by fut:un;o de'IØloper <br /> schedules, but It is tentatively pll!nnedthâtthe 5-mUIi! tr¡¡nsmlsslon line fr()(TI SBSA 10 1I\e <br />. Whipple Ave¡¡uE)/Hlghway 101lnterd1$ngtJcólllcl be in ptaêe by Iheyear 2006.'wtIlIelhe entire <br /> Greater B¡¡yfròntA.rea could be served by 2009. In this sœnario, the !lntire Alternative D project <br /> could be In pl¡¡œ by 2009. which may beadvanlageous to theCttyas the M¡¡s!er SélIes <br />. Agreement between San Frenåsco and suburban purchasers will be renegotiated In 2009/2010 <br /> (conlract eXplretion). <br />. <br />. <br />. <br />. <br /> WeIÐ~ Recycling Feasibility Study rot Redwood City xII <br />
The URL can be used to link to this page
Your browser does not support the video tag.