My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2015-02-09 Closed and Joint SA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2015
>
AgdaPkt 2015-02-09 Closed and Joint SA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2015 4:51:43 PM
Creation date
2/5/2015 4:15:24 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
2/9/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.2.B. - Page 22 <br /> Courtyard by Marriott <br /> Exhibit "C" <br /> INSPECTION AND MAINTENANCE CHECKLIST <br /> Stormwater Treatment Measure Operation and Maintenance <br /> Inspection Report to the City of Redwood City, California <br /> This report and attached Inspection and Maintenance Checklists document the inspection <br /> and maintenance conducted for the identified stormwater treatment measure(s) subject to <br /> the Maintenance Agreement between the City and the property owner during the annual <br /> reporting period indicated below. <br /> I. Property Information: <br /> Property Address or APN: 052 - 531 -130 <br /> Property Owner: Redwood City Hotels, LLC <br /> 11. Contact Information: <br /> Name of person to contact regarding this report: Gary E. Wamer/Warner Engineering <br /> Phone number of contact person: 253- 858 -8577 <br /> Email: gary@n,warnerengineering.com <br /> Address to which correspondence regarding this report should be directed: <br /> 2709 Jahn Ave NW, Suite H -5, Gig Harbor, WA 98335 <br /> 111. Reporting Period: <br /> This report, with the attached completed inspection checklists, documents the inspections <br /> and maintenance of the identified treatment measures during the time period from <br /> to <br /> IV. Stormwater Treatment Measure Information: <br /> The following stormwater treatment measures (identified treatment measures) are located <br /> on the property identified above and are subject to the Maintenance Agreement: <br /> Identifying Type of Treatment Measure Location of Treatment Measure on the <br /> Number of Property <br /> Treatment <br /> Measure <br /> 1 Bioretention area near SW building comer & along S building <br /> wall <br /> 2 Bioretention area along S building wall <br /> 3 Bioretention area along S building wall <br /> Page 1 O &M Inspection Report <br /> ATTY /AGR.600 Bair Island Road /Courtyard Marriot <br />
The URL can be used to link to this page
Your browser does not support the video tag.