My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC15-01 PC Reso (3051 ) to Adopt Initial Study-Mitigated Negative Declaration - La Palma
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2015
>
Reso PC15-01 PC Reso (3051 ) to Adopt Initial Study-Mitigated Negative Declaration - La Palma
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2015 9:44:00 AM
Creation date
2/23/2015 9:34:06 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
2/3/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mitigation Monitoring and Reporting Program <br /> Rcspitn ltlr' Sch i. 4 - `r <br /> Mit litter011 ifeteAsi 1 rit 1rnplr mrtiler Parr Y <br /> Utilities and Service Systems <br /> Mitigation Measure UTIL-1:Prior to the issuance of Grading and Applicant I City of Redwood I Prior to Grading and Encroachment <br /> Encroachment Permits,the applicant shall prepare a Water System Study of i Engineering and Permit issuance,a Water System <br /> the existing 6-inch water main in Kentfield Avenue to determine if the j Transportation Study shall be submitted for the <br /> existing flow and pressure are adequate to serve domestic needs and fire i Services review and approval by the <br /> flow requirements of the proposed project.If the Water System Study ! Engineering and Transportation <br /> determines the existing water main is inadequate to service the project,the Services <br /> applicant shall upgrade the water main to provide adequate flow and <br /> pressure to serve the project.The Water System Study and the proposed <br /> upgrade in size of the water main shall be submitted to Engineering and <br /> Transportation Services for review and approval. <br /> Mitigation Measure UTIL-2:Prior to the issuance of Grading and ! Applicant City of Redwood Prior to Grading and Encroachment <br /> Encroachment Permits,the applicant shall prepare a Wastewater System k Engineering and Permit issuance,a Wastewater <br /> Study of the existing 6-inch wastewater main in Kentfield Avenue to Transportation System Study shall be submitted for <br /> determine if there is adequate capacity to serve the project.The Wastewater Services the review and approval by the <br /> System Study shall account for the additional wastewater flow created by I Engineering and Transportation <br /> the project and the contribution to Inflow and Infiltration(I/I).If the Services <br /> Wastewater System Study determines the existing wastewater main is <br /> inadequate to service the project,the applicant shall upgrade a specified <br /> length of the wastewater main to provide adequate capacity to serve the <br /> project or pay an established in-lieu fee.The Wastewater System Study and <br /> the proposed upgrade in size of the wastewater main shall be submitted to <br /> I Engineering and Transportation Services for review and approval. <br />
The URL can be used to link to this page
Your browser does not support the video tag.