Laserfiche WebLink
Mitigation Monitoring and Reporting Program <br /> Rcspitn ltlr' Sch i. 4 - `r <br /> Mit litter011 ifeteAsi 1 rit 1rnplr mrtiler Parr Y <br /> Utilities and Service Systems <br /> Mitigation Measure UTIL-1:Prior to the issuance of Grading and Applicant I City of Redwood I Prior to Grading and Encroachment <br /> Encroachment Permits,the applicant shall prepare a Water System Study of i Engineering and Permit issuance,a Water System <br /> the existing 6-inch water main in Kentfield Avenue to determine if the j Transportation Study shall be submitted for the <br /> existing flow and pressure are adequate to serve domestic needs and fire i Services review and approval by the <br /> flow requirements of the proposed project.If the Water System Study ! Engineering and Transportation <br /> determines the existing water main is inadequate to service the project,the Services <br /> applicant shall upgrade the water main to provide adequate flow and <br /> pressure to serve the project.The Water System Study and the proposed <br /> upgrade in size of the water main shall be submitted to Engineering and <br /> Transportation Services for review and approval. <br /> Mitigation Measure UTIL-2:Prior to the issuance of Grading and ! Applicant City of Redwood Prior to Grading and Encroachment <br /> Encroachment Permits,the applicant shall prepare a Wastewater System k Engineering and Permit issuance,a Wastewater <br /> Study of the existing 6-inch wastewater main in Kentfield Avenue to Transportation System Study shall be submitted for <br /> determine if there is adequate capacity to serve the project.The Wastewater Services the review and approval by the <br /> System Study shall account for the additional wastewater flow created by I Engineering and Transportation <br /> the project and the contribution to Inflow and Infiltration(I/I).If the Services <br /> Wastewater System Study determines the existing wastewater main is <br /> inadequate to service the project,the applicant shall upgrade a specified <br /> length of the wastewater main to provide adequate capacity to serve the <br /> project or pay an established in-lieu fee.The Wastewater System Study and <br /> the proposed upgrade in size of the wastewater main shall be submitted to <br /> I Engineering and Transportation Services for review and approval. <br />