My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC15-01 PC Reso (3051 ) to Adopt Initial Study-Mitigated Negative Declaration - La Palma
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2015
>
Reso PC15-01 PC Reso (3051 ) to Adopt Initial Study-Mitigated Negative Declaration - La Palma
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2015 9:44:00 AM
Creation date
2/23/2015 9:34:06 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
2/3/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mitigated Negative Declaration <br /> water main to provide adequate flow and pressure to serve the project. The Water System <br /> Study and the proposed upgrade in size of the water main shall be submitted to <br /> Engineering and Transportation Services for review and approval. <br /> Mitigation Measure UTIL-2: Prior to the issuance of Grading and Encroachment Permits, the <br /> applicant shall prepare a Wastewater System Study of the existing 6-inch wastewater main <br /> in Kentfield Avenue to determine if there is adequate capacity to serve the project. The <br /> Wastewater System Study shall account for the additional wastewater flow created by the <br /> project and the contribution to Inflow and Infiltration{I/I). If the Wastewater System Study <br /> determines the existing wastewater main is inadequate to service the project, the applicant <br /> shall upgrade a specified length of the wastewater main to provide adequate capacity to <br /> serve the project or pay an established in-lieu fee.The Wastewater System Study and the <br /> proposed upgrade in size of the wastewater main shall be submitted to Engineering and <br /> Transportation Services for review and approval. <br /> La Palma Subdivision Project <br /> Final Initial Study/Mitigated Negative Declaration <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.