Laserfiche WebLink
Mitigation Monitoring and Reporting Program <br /> tUiitipahon Mawr Implerrti nt r Rrtsponsibte S�:"rledu!n wiry <br /> carfiy Menrtortng Mk1I'od <br /> Transportation and Traffic <br /> Mitigation Measures TRAF-1: Prior to the issuance of Building Permits, Applicant City of Redwood Prior to Building Permit issuance, <br /> the applicant shall submit project plans to the City's Fire Marshall for City's Fire Marshall project plans showing the <br /> review to determine that all roadway surface areas and turning I project's roadway surfaces and <br /> radii conform to standards for emergency vehicle access. I turning radii shall be submitted <br /> Roadways to be used for emergency vehicle access shall be I for the review and approval by <br /> marked as fire lanes and marked in accordance with Section ; the City's Fire Marshall <br /> 22500.1 of the California Vehicle Code <br /> Utilities and Service Systems <br /> W <br /> Mitigation Measure UTIL-1:Prior to the issuance of Grading and I Applicant ' City of Redwood Prior to Grading and <br /> Encroachment Permits,the applicant shall prepare a Water System i Engineering and Encroachment Permit issuance, <br /> Study of the existing 6-inch water main in Kentfield Avenue to Transportation a Water System Study shall be <br /> determine if the existing flow and pressure are adequate to serve Services submitted for the review and <br /> domestic needs and fire flow requirements of the proposed project. approval by the Engineering <br /> If the Water System Study determines the existing water main is and Transportation Services <br /> inadequate to service the project,the applicant shall upgrade the <br /> water main to provide adequate flow and pressure to serve the a <br /> project.The Water System Study and the proposed upgrade in size ! <br /> of the water main shall be submitted to Engineering and <br /> Transportation Services for review and approval. I <br /> Mitigation Measure UTIL-2: Prior to the issuance of Grading and Applicant City of Redwood Prior to Grading and <br /> Encroachment Permits,the applicant shall prepare a Wastewater Engineering and Encroachment Permit issuance, <br /> System Study of the existing 6-inch wastewater main in Kentfield Transportation a Wastewater System Study shall <br /> Avenue to determine if there is adequate capacity to serve the Services be submitted for the review and <br /> project.The Wastewater System Study shall account for the approval by the Engineering <br /> additional wastewater flow created by the project and the and Transportation Services <br /> contribution to Inflow and Infiltration (I/I). If the Wastewater System <br /> Study determines the existing wastewater main is inadequate to <br /> service the project,the applicant shall upgrade a specified length <br /> of the wastewater main to provide adequate capacity to serve the <br /> project or pay an established in-lieu fee.The Wastewater System <br /> Study and the proposed upgrade in size of the wastewater main <br /> shall be submitted to Engineering and Transportation Services for <br /> review and approval. <br /> La Palma Subdivision Project <br /> Final Initial Study/Mitigated Negative Declaration <br /> 81 <br />