My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC15-01 PC Reso (3051 ) to Adopt Initial Study-Mitigated Negative Declaration - La Palma
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2015
>
Reso PC15-01 PC Reso (3051 ) to Adopt Initial Study-Mitigated Negative Declaration - La Palma
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2015 9:44:00 AM
Creation date
2/23/2015 9:34:06 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
2/3/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
..__. ._. ..._ . <br /> Mitigation Monitoring and Reporting Program <br /> nisporud <br /> MitiKarinn M Vasil rr, 1110cMen lcl° Partt` <br /> Mitigation Measure AIR-1,continued <br /> • All roadways,driveways,and sidewalks to be paved shall be completed <br /> as soon as feasible.Building pads shall be laid as soon as possible after <br /> grading unless seeding or soil binders are used. <br /> • Idling times shall be minimized either by shutting equipment off when <br /> not in use or reducing the maximum idling time to 5 minutes(as � <br /> required by the California airborne toxics control measure Title 13, <br /> Section 2485 of California Code of Regulations). <br /> • Clear signage shall be provided for construction workers at all access <br /> points. <br /> • All construction equipment shall be maintained and properly tuned in <br /> accordance with manufacturer's specifications.All equipment shall be <br /> checked by a certified visible emissions evaluator. <br /> • Post a publicly visible sign with the telephone number and person to <br /> contact at the lead agency regarding dust complaints.This person shall I <br /> be responsible and take corrective action within 48 hours.The Air <br /> District's phone number shall also be visible to ensure compliance with <br /> applicable regulations. <br /> ' Mitigation Measure AIR-2:Demolition of the existing homes and buildings I Applicant's City of Redwood City During project demolition <br /> shall be performed consistent with District Regulation 11,Rule 2:Asbestos I construction Planning Services construction activities the measure <br /> Demolition,Renovation and Manufacturing. contractor shall be implemented <br /> A licant's Ci of Redwood Ci Durin <br /> Mitigation Measure AIR-3:Only one phase of construction shall occur at a PP City City g project construction <br /> time(e.g.,paving would occur prior to development of the homes). construction Planning Services activities the measure shall be <br /> contractor . implemented <br />
The URL can be used to link to this page
Your browser does not support the video tag.