Laserfiche WebLink
Courtyard by Marriott <br /> 4 Bioretention area near S driveway approach onto One Marina <br /> Way <br /> "S" Bioretention area along One Marina Way frontage <br /> "M" Bioretention area along One Marina Way frontage <br /> "N" Bioretention azea along One Marina Way frontage <br /> EX. Exisitng Bioretention xrea along One Marina Way frontage <br /> V. Summary of Inspections and Maintenance: <br /> Summarize the following information using the attached Inspection and Maintenance <br /> Checklists: <br /> Identifying Date of Operation and Maintenance Activities Additional Comments <br /> Number of Inspection Performed and Date(s)Conducted <br /> Treatment <br /> Measure <br /> VI. Sediment Removal: <br /> Total amount of accumulated sedimentxemoved from the stormwater treatment <br /> measure(s)during the reporting period: cubic yards. <br /> How was sediment disposed? <br /> ❑ landfill <br /> ❑ other location on-site as described in and allowed by the maintenance <br /> plan <br /> Page 2 O&M Inspection Report <br /> ATfY/AGR.600 Bair Island Road/Courtyard Marriot <br />