Laserfiche WebLink
good working order acceptable to the City and in accordance with the Site Plan and <br /> Inspection and Maintenance Checklist. This includes all pipes, channels or other <br /> conveyances built to convey stormwater to the treatment measure(s), as well as all <br /> structures, improvements, and vegetation provided to control the quantity and quality of <br /> the stormwater as set forth in the Site Plan . Adequate maintenance is herein defined as <br /> maintaining the described facilities in good working condition so that these facilities <br /> continue to operate as originally designed and approved. The Inspection and <br /> Maintenance Checklist shall include a detailed description of and schedule for long-term <br /> maintenance activities of the stormwater treatment measures. <br /> 4. Sediment Management. Sediment accumulation resulting from the normal <br /> operation of the stormwater treatment measure(s) will be managed appropriately by the <br /> Property Owner. The Property Owner will provide for the removal and disposal of <br /> accumulated sediments. Disposal of accumulated sediments shall not occur on the <br /> Property. Any disposal or removal of accumulated sediments or debris shall be in <br /> compliance with all federal, state and local law and regulations. <br /> 5. Annual Inspection and Report. The Property Owner shall, on an annual basis, <br /> complete a Treatment Measure Operation and Maintenance Inspection Report ("Annual <br /> Report'). . The. Annual Report shall Include all . completed Inspection and Maintenance <br /> Checklists for the reporting period and shall be submitted to the City in order to verify <br /> that inspection and maintenance of the applicable stormwater treatment measure(s) <br /> have been conducted pursuant to this Agreement. The Annual Report shall be submitted <br /> no later than December 31 of each year, under penalty of perjury, to Office of the City <br /> Engineer, 1017 Middlefield Road, Redwood City, CA 94063 or another member of the <br /> City staff as directed by the City. The Property Owner shall provide in the Annual Report a <br /> record of the volume of all accumulated sediment removed as a result of the treatment <br /> measure(s). The Property Owner shall conduct a minimum of one (1 ) annual inspection of <br /> the stormwater treatment measure(s) before the wet season. This inspection shall occur <br /> between August 18t and October 1st each year. More frequent inspections may be <br /> required. The results of inspections shall be recorded on the Annual Inspection Report. <br /> 6. Necessary Changes and Modifications. At its sole expense, the Property Owner <br /> shall make changes or modifications to the stormwater treatment measure(s) as may be <br /> determined as reasonably necessary by the. City to ensure that the stormwater treatment <br /> measures are properly maintained and continue to operate as originally designed and <br /> approved . <br /> 7. Access to the Property. The Property Owner hereby grants permission to the City; <br /> the. San Francisco Bay Regional Water Quality Control .Board (Regional Board); the San <br /> Mateo County Mosquito Abatement District (Mosquito Abatement District); and their <br /> authorized agents and employees to enter upon the Property at reasonable times and in a <br /> reasonable manner to inspect, assess or observe the stormwater treatment measure(s) in <br /> order to ensure that the stormwater treatment measures are being properly maintained <br /> and are continuing to perform in an adequate manner to protect water quality and the <br /> public health and safety. This includes the right to enter upon the Property whenever there <br /> is a reasonable basis to believe that a violation of this Agreement, the City Stormwater <br /> REV; 12-04-14 VR <br /> Page 3 of 7 <br /> ATTY/AGR.2014.255/Rossi. Lane - Lot 2 - STMMA <br />