My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res04 14590
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2000-2009
>
2004
>
Res04 14590
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2011 1:17:40 PM
Creation date
6/9/2004 2:12:37 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Agency Type
City Council
Date
6/7/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Legend. Applicant = project applicant, City = City of Redwood City <br />Page 34 May 18, 2004 WP9.016451MMCHT.645 <br />MONITORING <br />VERIFICATION <br />IDENTIFIED IMPACT <br />RELATED MITIGATION MEASURE <br />Impl. <br />Type of Impl. <br />Monitoring and <br />Timing <br />Signature <br />Date <br />(CONDITION OF APPROVAL) <br />Entity <br />Action <br />Verification Entity <br />Requirements <br />resolved to the satisfaction of the NMFS and <br />CDFG. Copies of written correspondence <br />between NMFS and CDFG and the <br />applicant shall be submitted to the City prior <br />to issuance of a grading permit. <br />Implementation of these measures would <br />reduce these impacts to a less -than- <br />significant level. <br />Impact 8 -2: Impacts on Essential Fish <br />Mitigation 8 -2. The applicant shall <br />Applicant <br />Coordinate with <br />City <br />Coordinate with <br />Habitat. The proposed project would fill <br />implement Mitigation 8 -1 above with respect <br />National Marine <br />NMFS and <br />approximately 9.8 acres of estuarine Essential <br />to Essential Fish Habitat. This measure <br />Fisheries Service <br />CDFG, and <br />Fish Habitat. Impacts on federally managed <br />would reduce the project's impact on <br />(NMFS) and <br />formulate <br />species protected under Essential Fish <br />Essential Fish Habitat to a less -than- <br />California Dept. of <br />HMMP, prior to <br />Habitat regulations are similar to impacts on <br />significant level. <br />Fish and Game <br />grading permit <br />salmon and steelhead. Filling the bottom of <br />(CDFG); formulate <br />issuance; <br />the Bay would result in a loss of essential <br />and implement <br />implement <br />benthic habitat for many species of rockfish, <br />Habitat Mitigation <br />HMMP during <br />flat fish, sharks, and rays. Filling the water <br />and Monitoring <br />construction <br />column would adversely impact several <br />Plan (HMMP). <br />federally managed species, including Pacific <br />sardine and the northern anchovy. <br />Construction activities could also result in <br />increased water turbidity, contaminant <br />release, noise, and underwater shock waves. <br />These possible effects represent a potentially <br />significant impact. <br />Impact 8 -3: Impacts on the California <br />Mitigation 8 -3. The applicant shall: <br />Applicant <br />Coordinate with <br />City <br />Coordinate with <br />Clapper Rail. Project construction would <br />(1) coordinate with the USFWS and CDFG <br />U.S. Fish and <br />USFWS and <br />result in direct long -term loss of intertidal <br />on California clapper rail issues; and <br />Wildlife Service <br />CDFG, and <br />wetland along Redwood Creek and Smith <br />(2) formulate and implement a Habitat <br />(USFWS) and <br />formulate <br />Slough sufficient to support incidental foraging <br />Mitigation and Monitoring Plan (HMMP) for <br />California Dept. of <br />HMMP, prior to <br />by the California clapper rail, a federal- and <br />this potentially affected species to the <br />Fish and Game <br />grading permit <br />state - listed endangered species. Noise from <br />satisfaction of the USFWS and CDFG. The <br />(CDFG); formulate <br />issuance; <br />project construction and project disturbance of <br />HMMP should stipulate avoidance of <br />and implement <br />implement <br />intertidal habitat could interfere with the ability <br />construction operations during the California <br />Habitat Mitigation <br />HMMP during <br />of the clapper rails to detect predators. <br />clapper rail breeding season. To determine <br />and Monitoring <br />construction <br />Impacts on clapper rails from noise <br />presence of breeding special- status species <br />Plan (HMMP). <br />associated with pile driving, heavy <br />in the project vicinity, USFWS-approved <br />construction, and earthmoving equipment in <br />clapper rail surveys should be conducted <br />particular are potentially significant. These <br />during the breeding season, prior to <br />Legend. Applicant = project applicant, City = City of Redwood City <br />Page 34 May 18, 2004 WP9.016451MMCHT.645 <br />
The URL can be used to link to this page
Your browser does not support the video tag.