My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res04 14590
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2000-2009
>
2004
>
Res04 14590
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2011 1:17:40 PM
Creation date
6/9/2004 2:12:37 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Agency Type
City Council
Date
6/7/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
IDENTIFIED IMPACT <br />INFRASTRUCTURE AND PUBLIC <br />SERVICES <br />Impact 10 -1: Project- Related and <br />Cumulative Municipal Water Service <br />Demand. The project would increase the <br />demand for municipal water service in the <br />project vicinity. Preliminary estimates indicate <br />that the project could generate a demand for <br />approximately 3,500 gallons per minute of <br />emergency fire flow, up to approx. 750,000 <br />gallons of total fire flow volume, approx. <br />1,550,000 gallons of emergency water storage <br />on- or off -site, and a net increase of approx. <br />450,000 gallons of domestic water demand <br />(approximately 1.4 acre -feet) per average day, <br />or 500 acre -feet per year. Redwood City <br />already exceeds its contracted allocation of <br />water from the San Francisco Public Utilities <br />Commission (SFPUC) by approximately 1,000 <br />acre-feet annually, and is predicted to exceed <br />its allocation by approximately 2,700 acre -feet <br />annually by 2009. As required by California <br />SB 610, the Redwood City City Council <br />approved the Water Supply Assessment <br />RELATED MITIGATION MEASURE <br />(CONDITION OF APPROVAL) <br />sectional area) of Redwood Creek <br />through the project reach. If the <br />computations indicate loss of effective <br />depths and channel cross - sections, the <br />applicant shall determine the increased <br />volume and frequency of dredging <br />required to maintain navigability in <br />Redwood Creek. The applicant and <br />the City shall then negotiate to <br />determine an equitable fee structure for <br />project residents to compensate for the <br />additional costs of channel <br />maintenance. <br />Implementation of the above mitigation <br />measures would reduce project impacts on <br />siltation rates and dredging frequencies and <br />costs to a less - than - significant level. <br />Mitigation 10 -1. As required by State SB <br />221, prior to City approval of any tentative <br />map or development agreement for the <br />proposed project, the City of Redwood City <br />Public Works Services Department shall <br />undertake a subsequent water supply <br />analysis, which shall describe the citywide <br />water supply situation at that future time, <br />reflecting progress on current City studies <br />and plans for finding opportunities for water <br />transfers, expanding its recycled water <br />program, and implementing additional "best <br />management practices" (BMPs) for water <br />conservation. As required by SB 221, no <br />tentative map or development agreement <br />shall be approved until a water supply <br />analysis concludes that sufficient water will <br />be available to serve the proposed project <br />needs. <br />The project applicant shall also be required <br />to comply with all applicable current and <br />Legend. Applicant = project applicant, City = City of Redwood City <br />MONITORING <br />Impl. Type of Impl <br />Entity I Action <br />Applicant/ <br />City <br />Undertake <br />subsequent water <br />supply analysis <br />(City). Comply with <br />current and future <br />water demand <br />perf ormance <br />standards <br />(applicant). <br />VERIFICA'I ION <br />Monitoring 9 and Timing Si nature Date <br />Verification Entity Requirement I 9 <br />City <br />Analysis prior to <br />tentative map/ <br />development <br />agreement <br />approval; <br />compliance <br />throughout life of <br />project <br />Page 45 May 18, 2004 WP9.016451MMCHT.645 <br />
The URL can be used to link to this page
Your browser does not support the video tag.