My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt15 CEI Solar One, LLC
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2015
>
Agmt15 CEI Solar One, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2015 4:26:02 PM
Creation date
4/1/2015 4:25:45 PM
Metadata
Fields
Template:
Agreement
Contractor Name
CEI Solar One, LLC
PROJECT NAME
Power Purchase Agreement
RMP File Number
304
Date
3/31/2015
Reso Ref
15396
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit B. Engineering and Construction Requirements <br /> 4.3 Line Location <br /> Seller will be responsible for locating, identifying and protecting existing underground utilities <br /> conduits, piping, substructures, etc. and ensuring that no damage is inflicted upon existing <br /> infrastructure. In addition to USA Dig and utility line-locating, a private line-locator must be used <br /> for any project requiring underground work. <br /> 4.4 Quality Assurance and Quality Control <br /> Seller shall implement a Quality Assurance / Quality Control (QA/QC) plan for construction <br /> activities on Buyer sites. At least 30 days prior to the planned commencement of construction, <br /> Seller shall submit a copy of the QA/QC Plan for review and approval by the Buyer. <br /> To ensure the highest quality of the installation, Seller shall: <br /> • Implement policies and procedures to ensure proper oversight of construction work, <br /> verification of adherence to construction documents and contractual requirements, and <br /> rapid identification and mitigation of issues and risks. <br /> • Utilize best practice methods for communicating progress, performing work according to <br /> the approved Project schedule, and completing the Project on-time. <br /> • Keep the Site clean and orderly throughout the duration of construction. All trash and <br /> rubbish shall be disposed of off-site by licensed waste disposal companies and in <br /> accordance with applicable Law. <br /> • Provide equipment marking, as well as labeling and signage for the Project that shall be <br /> removed after Project completion. <br /> • Fully comply with all applicable notification,safety and Work rules(including Buyer safety <br /> standards) when working on or near Buyer facilities. <br /> • Provide Special Inspection for trenching, rebar, concrete, welding, and roof attachment <br /> work, according to AHJ requirements. <br /> • Route all electrical collection system wiring and conduits in a neat and orderlyfashion and <br /> in accordance with all applicable code requirements. All cable terminations, excluding <br /> module-to-module and module-to-cable harness connections, shall be permanently <br /> labeled. <br /> • Torque all mechanical and electrical connections and terminations according to <br /> manufacturer specifications, with marking/sealing of all electrical terminations at <br /> appropriate torque point. <br /> • Provide all temporary road and warning signs,flagmen or equipment as required to safely <br /> execute the Work.Street sweeping services shall also be provided as required to keep any <br /> dirt, soil, mud, etc. off of roads. Comply with all state and local storm water pollution <br /> prevention (SWPP) ordinances. <br /> Exhibit B Page 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.