My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt15 CEI Solar One, LLC
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2015
>
Agmt15 CEI Solar One, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2015 4:26:02 PM
Creation date
4/1/2015 4:25:45 PM
Metadata
Fields
Template:
Agreement
Contractor Name
CEI Solar One, LLC
PROJECT NAME
Power Purchase Agreement
RMP File Number
304
Date
3/31/2015
Reso Ref
15396
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit B. Engineering and Construction Requirements <br /> prior to the first design submission. The Buyer will review all submittals, provide written <br /> comments, and conduct Design Review Meetings for each stage of the process. Seller shall <br /> provide additional detail, as required, at each successive stage of the Design Review. Seller shall <br /> not order equipment and materials until Schematic Design submittals have been approved.Seller <br /> shall not begin construction until Construction Documents have been approved and all required <br /> permits have been obtained.The Buyer will formally approve, in writing,each phase of the design <br /> and is the sole arbiter of whether each phase of the design has been completed.The Seller shall <br /> not enter a subsequent design phase without the approval of the Buyer. <br /> Seller shall be held solely responsible for obtaining approvals from the Buyer, including revising <br /> designs as necessary until they are given approval by the Buyer and all other required entities <br /> and organizations. A description of requirements for each design phase is provided below. <br /> System design shall comply with all applicable laws, statutes, ordinances, codes, rules, and <br /> regulations for construction projects of jurisdictions with authority over the Buyer. Seller is <br /> responsible for providing designs approved by the appropriate professional engineers registered <br /> in the State of California.Costs for engineering reviews and approvals shall be borne by the Seller. <br /> System designs must take into account Buyer aesthetic issues and not conflict with any current <br /> Buyer operations. <br /> 3.1.1 Schematic Design <br /> Seller shall prepare Schematic Design documents consisting of drawings and other documents <br /> illustrating the scale and relationship of Project components, including but not limited to, <br /> schematic design studies,site utilization plans, PV array layouts and design information,a shading <br /> analysis, electrical single-line diagrams, wiring and conduit schedule, equipment lists and bills of <br /> material, and equipment cut sheets or specifications. <br /> 3.1.2 Design Development <br /> Design Development documents shall consist of elevations, cross sections, and other drawings <br /> and documents necessary to depict the design of the Project. This submittal shall include <br /> architectural, structural, geotechnical, mechanical and electrical design documents and <br /> equipment specifications to illustrate the size, character, and quality of the Project and <br /> demonstrate that it meets the performance specifications defined in this RFP. The Design <br /> Development documents shall represent 100%of the intended scope for the Project. <br /> Exhibit B Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.