My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2015-04-13 Closed and Joint SA and PFA REVISED 04_10_2015
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2015
>
AgdaPkt 2015-04-13 Closed and Joint SA and PFA REVISED 04_10_2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2015 8:11:02 AM
Creation date
4/9/2015 4:34:15 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
4/13/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.1.B. - Page 76 <br /> 118.0,le Floor Remodel Meech 15,2909 <br /> Page on COO EST 061941 <br /> A Pavement repairs,reatripiog,and spot scaling: 359:990.00 <br /> A Tune up(nol rebuild}oII HVAC mits and roof ductwork: 113,600.00 <br /> A Patch,prune and paint nu mare.than 12 small(4'x4'or smaller)shretrock patches in <br /> multiple 00000 of waif and ceiling 3 22,0.50.01) <br /> A Perform no more than 6 small(6'06'or smaller)vet andlor carpel repairs:$0,400.00 <br /> Y Repair&shore up no mono than 14 existing doors no as to operate <br /> normally(includes prone&paint): • 3 23,100.00 <br /> ➢ Repair ousting roofing material,skylights,gutters,&downspouts:314,700.00 <br /> A Replace no more than 940'of anterior aiding,trim,z channel&vapor harien.$136,91111AP <br /> Y Caulk,prime(where needed),and paint exterior wood siding&trim:144,100.00 <br /> Total Eathnete Price for CONSTRUCTION/CARPENTRY:3 352.800.00 <br /> GRAND TO'fAt.Cs-L'VIA PItt PRICE,4414 no4, 1(mahout ptrunbhrg nr'exit signs). <br /> •NOTES: <br /> a' Please keep inimical that access to areas may be limited,occupied or restricted. <br /> ✓ Scheduling will take time and cooperation between all parties will he necessary <br /> to ensure impact to the public,staff,and[mama will he as minimal as possible. <br /> ✓ Do to the age and state of repair for much of the facility.some imoidemtals will <br /> nano up as work lakes place.Example:exterior siding in removed revealing <br /> ceded framing repair or replac ear_This camront be foreborn;therefore,a <br /> change order Pm any work above&beyond anticipated work will be submitted <br /> for approval. <br /> I. A project daily roper[will be oompletcd by the Cnoamrerinn Services n,rihorized <br /> r eptssnntative and is available upon request <br /> 2. Costa for material,rental equipment,subcontractor invoices,and other miaeallmteous items <br /> net listed above will be charged at invoice. <br /> 3. Any and all changes ro the scope of work as detailed above will he done by authorised <br /> change order only, <br /> MAULCUSOM,r <br /> I).9nytfiing not noted above. <br /> 2]Uafern-esn obstructions or changes to the scope orprogresr afwry work. <br /> a. Seth ob to'tt ions or changes will lie discussed with the customer and agrcan atr <br /> will be mude ors appropriate revu.taa m the budget tn$kee any jirthw work it <br /> done <br /> (111111x1) <br /> I)Meetings_ <br /> 4)Acts of nature, <br /> a. Malaysia work <br /> 72IPage February 5 , 2015 <br /> ATTY/AGR/2015.057/SAN MATEO COUNTY-ANIMAL CONTROL SERVICES <br />
The URL can be used to link to this page
Your browser does not support the video tag.