Laserfiche WebLink
8.A. - Page 51 <br /> COMMERCIAL <br /> (Billed Monthly) <br /> Meter Size <br /> (inch) Charge <br /> 5/8 $26.14 <br /> 3/4 $39.21 <br /> 1 $65.33 <br /> 1 1/2 $130.69 <br /> 2 $209.07 <br /> 3 $392.04 <br /> 4 $653.40 <br /> 6 $1,306.80 <br /> 8 $1,306.80 <br /> 10 $1,306.80 <br /> Quantity Charge.) <br /> (Unit=100 cubic feet) <br /> 0-15 Units $4.42 <br /> 16+Units $7.22 <br /> Source:City of Redwood City-Public Works Services Department. <br /> Connection and Facilities Fees. The following table sets forth the current Enterprise <br /> schedule of connection and facilities fees for the Enterprise, which was approved in 1994. <br /> The property owner is responsible for the cost of connection to the City's water main. <br /> Every application requesting such a connection to the City is required to be accompanied by a <br /> water connection fee. A facilities fee is established to provide for the use and construction of <br /> existing and future water system capital facilities in accordance with a capital improvement <br /> program approved by the City Council. Such fee is collected concurrently with the connection <br /> fees. The facilities fee is charged per dwelling unit equivalent(DUE). <br /> Table 10 <br /> Current Connection and Facilities Fees <br /> Meter Size Meter Installation Service Line <br /> (inch) Fee Installation Fee Water Facilities Fee <br /> 5/8 $150.00 $1,787.00 <br /> 3/4 $175.00 $2,680.50 <br /> 1 $200.00 $4,467.50 <br /> 1 i/z" $350.00 determined at time $8,935.00 <br /> 2 $450.00 of application $14,296.00 <br /> 3 $725.00 $26,805.00 <br /> 4 $1,400.00 $44,675.00 <br /> 6 determined at time $89,350.00 <br /> of application <br /> Source:City of Redwood City-Public Works Services Department. <br /> -27- <br />