Laserfiche WebLink
7.1.E. - Page 14 <br /> EXHIBIT A <br /> 1. Scope of Work/Tasks Deadline <br /> Scope of work House move to 611 Heller <br /> Street, Redwood City Cost Billed <br /> Strip siding around foundation and pony wall $1,200.00 <br /> Cut house loose from foundation $1,200.00 <br /> Cut utilities loose from house $1,200.00 <br /> Debris removal $700.00 <br /> Prepare Site at 611 Heller Street, Redwood City <br /> Site preparation $900.00 <br /> New foundation and pony wall framing $36,000.00 <br /> Electrical hook up $1,200.00 <br /> Sewer hook up $2,500.00 <br /> Hook up new water main $2,500.00 <br /> Allowance for drywall repair after move $3,000.00 Optional <br /> Replace siding at pony wall and foundation $3,200.00 Materials <br /> Replace siding at pony wall and foundation $3,800.00 Labor <br /> New driveway $5,000.00 Optional <br /> Paint house exterior $8,000.00 Optional <br /> AJB Management fee $2,800.00 <br /> Permits not included <br /> Subtotal $73,200.00 <br /> Contractors Profit and Overhead $10,980.00 <br /> TOTAL. $84,180.00 <br /> Additional Notes: (1)All permits will be obtained by the City of Redwood City. <br /> (2) Work not included in proposal are: cost of Police escort; cost of railroad permits, cost of <br /> moving any utility lines (3) No special inspections included (lead abatement, air quality, or <br /> asbestos). (4) City of Redwood City will also be responsible for any tree trimming that is <br /> necessary along the route. <br /> 2. Payment Terms. Flat Fee for work performed as indicated in Section 1. <br /> REV:05-12-15 VR <br /> Page 6of6 <br /> ATTY/AGR2015.0931AJB Construction/103 Wilson Street House <br />