My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC15-08 PC Reso (3086 ) 1305 El Camino
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2015
>
Reso PC15-08 PC Reso (3086 ) 1305 El Camino
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2015 11:49:04 AM
Creation date
5/20/2015 11:47:06 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
5/15/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
66020, this 90-day protest period has begun as of the date of the approval of this <br /> application. [SDR][OFFICE OF THE CITY ATTORNEY] <br /> Landscaping and Site Improvements <br /> 7. Landscaping Improvements — A landscaping and irrigation plan shall be included in <br /> the Building Permit submittal. [COA][PLANNING] <br /> 8. Tree Protection - Tree protection measures shall be provided for all trees to remain <br /> near the project that are 12" in diameter and larger. These measures shall be shown on <br /> the building permit plans. [COA][PLANNING] <br /> 9. Tree Removal & Trimming —The applicant shall hire a qualified biologist to conduct a <br /> survey for nesting birds prior to tree removal or trimming, and submit the survey for <br /> filing. All tree removal and trimming shall take place outside of the breeding season. <br /> [COA][PLANNING] <br /> 10. Tree Removal Permit - The applicant shall obtain a Tree Removal Permit for the <br /> removal of 8 protected trees (tagged #25, 27-32 in Hort Science Arborist Report) as <br /> defined within the City's Tree Preservation Ordinance. [SDR][PLANNING] <br /> 11. Stormwater Runoff- Post-construction runoff into the storm drain shall not exceed pre- <br /> construction runoff levels. The applicant's design professional shall evaluate the <br /> project's impact to the City's storm drainage system and shall substantiate their <br /> conclusions with drainage calculations to the satisfaction of the City Engineer. The <br /> project shall be designed in conformance with the Drainage Guidelines for Commercial <br /> Development. [SDR][ENGINEERING] <br /> 12. Exterior Lighting — New exterior lighting requires final review by the City prior to <br /> building permit issuance. As part of the Building Permit submittal package, the applicant <br /> shall provide a lighting plan including cut-sheets for all new fixtures, as well as <br /> photometric evaluation site plan demonstrating that light levels are appropriate for the <br /> use and that the new light sources do not introduce glare or light effects that spill off the <br /> property. [COA][PLANNING] <br /> 13. Bicycle Parking—The project shall provide for a minimum of 31 bicycle storage spaces <br /> within the parking garage and 5 bicycle racks within the sidewalk. <br /> [COA][ENG I NEERING] <br /> 14. Outdoor Uses — Any outdoor use not identified with this project requires separate <br /> review and approval by the City. [SDR][PLANNING] <br /> Final Map <br /> 15. Final Map - Final Maps shall be reviewed and approved by the City Council, and <br /> recorded prior to issuance of the building permit. All final maps shall conform to the <br /> Subdivision Map Act and Chapter 30 of the Municipal Code. The Parcel Map shall <br /> include the merging of all lots into one lot and any proposed easements. The Parcel <br /> Map shall be approved by the City Council prior to recordation of public easement <br /> dedications. [SDR][ENGINEERING] <br /> ATTY/RES0.3086/PC RESO 1305 EL CAMINO <br /> REV:05-14-15 VR <br /> Page 6 of 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.