My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt15 AJB Construction
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2015
>
Agmt15 AJB Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2015 12:30:04 PM
Creation date
6/4/2015 12:30:03 PM
Metadata
Fields
Template:
Agreement
Contractor Name
AJB Construction
PROJECT NAME
House move to 611 Heller St
RMP File Number
304
Date
5/21/2015
MO Ref
15-069
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT A <br /> 1. Scoue of Work/Tasks Deadline <br /> Scope of work House move to 611 Heller <br /> Street, Redwood Ci Cost Billed <br /> Stri sidin around foundation and on wall $1,200.00 <br /> Cut house loose from foundation $1,200.00 <br /> Cut utilities loose from house $1,200.00 <br /> Debris removal $700.00 <br /> Pre are Site at 611 Heller Street, Redwood Ci <br /> Site re aration $900.00 <br /> New foundation and n wall framin $36,000.00 <br /> Electrical hook u $1,200.00 <br /> Sewer hook u $2,500.00 <br /> Hook u new water main $2,500.00 <br /> Allowance for d all re air after move $3,000.00 O tional <br /> Re lace sidin at n wall and foundation $3,200.00 Materials <br /> Re lace sidin at n wall and foundation $3,800.00 Labor <br /> New drivewa $5,000.00 O tional <br /> Paint house exterior $8,000.00 O tional <br /> AJB Mana ement fee $2,800.00 <br /> Permits not included <br /> Subtotal $73,200.00 <br /> Contractors Profit and Overhead $10,980.00 <br /> TOTAL $84,180.00 <br /> Additional Notes: (1)All permits will be obtained by the City of Redwood City. <br /> (2) Work not included in proposal are: cost of Police escort; cost of railroad pernuts, cost of <br /> moving any utility lines (3) No special inspections included (lead abatement, air quality, or <br /> asbestos). (4) City of Redwood City will also be responsible for a.ny tree trimming that is <br /> necessary along the route. <br /> 2. Pavment Terms. Flat Fee for work performed as indicated in Section 1. <br /> REV:05-12-15 VR <br /> Page 6 of 6 <br /> ATTY/AGR.2015.093/AJB Construction/103 Wilson Street House <br />
The URL can be used to link to this page
Your browser does not support the video tag.