My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2015-06-08 Joint SA and PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2015
>
AgdaPkt 2015-06-08 Joint SA and PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2015 9:08:33 AM
Creation date
6/4/2015 5:22:10 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
6/8/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
446
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
103 Wilson Street <br />Page 1 O&M Inspection Report <br />Storm Water Treatment Operation and Maintenance <br />Inspection Report to the City of Redwood City, California <br />This report and attached Inspection and Maintenance Checklists document the inspection <br />and maintenance conducted for the identified storm water treatment measure(s) subject to <br />the Maintenance Agreement between the City and the property owner during the annual <br />reporting period indicated below. <br />I.Property Information: <br />Property Address or APN: 053-171-01, 02, 03, 04, 06, 07, 08 <br />Property Owner:Greystar Development, LLC <br />II.Contact Information: <br />Name of person to contact regarding this report: Jonathan Hayes <br />Contact Number: (415) 489-3906 Email:jhayes@greystar.com <br />Address to which correspondence regarding this report should be directed: <br />221 Main Street Suite 1280 <br />San Francisco, CA 94105 <br />III.Reporting Period: <br />This report, with the attached completed inspection checklists, documents the inspections <br />and maintenance of the identified treatment measures during the time period from: <br /> to . <br />IV.Storm Water Treatment Measure Information: <br />The following storm water treatment measures (identified treatment measures) are <br />located on the property identified above and are subject to the Maintenance Agreement: <br />Treatment Device Type of Treatment Location <br />Media Filter Vault #1 <br />(MFV-1) <br />(4) 18” Perk Filters Rear of property in access alley <br />Media Filter Manhole #2 <br />(MFV-2) <br />(2) 18” Perk Filters Front of property near to <br />intersection of Jefferson & <br />Franklin <br />7.1.D. - Page 22
The URL can be used to link to this page
Your browser does not support the video tag.