My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2015-06-08 Joint SA and PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2015
>
AgdaPkt 2015-06-08 Joint SA and PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2015 9:08:33 AM
Creation date
6/4/2015 5:22:10 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
6/8/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
446
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
255 Shoreline Drive, Suite 200 <br />Redwood City, CA 94065 <br />650/482-3600, Fax 650/482-6399 <br /> Page 1 of 1 <br /> NARRATIVE DESCRIPTION <br />TIF-ELIGIBLE IMPROVEMENTS <br /> <br /> <br />As part of the 103 Wilson (Jefferson & Franklin) project, the developer will construct <br />improvements within the public right-of-way on Franklin Street. Certain improvements will be <br />eligible for funding under the City’s Transportation Impact Fee (TIF) program. The <br />improvements which are eligible for this funding are described below. <br /> <br />I. Bulb-outs at Intersection of Franklin and Wilson Streets <br />Bulb-outs will be installed on the sidewalk at each of the four corners of the Franklin <br />and Wilson Intersection. New ADA-compliant curb ramps will be installed at each of <br />these bulb-outs. The intersection will be re-graded and paved to accommodate the <br />bulb-outs. In addition, a new curb inlet will be installed at the West corner of the <br />intersection and connected to the existing Storm Drain in Franklin Street at a new <br />manhole. This curb inlet is required to create positive drainage at the bulb-out at a <br />slope acceptable to the City. <br /> <br />II. Franklin Street Sidewalk Replacement at AT&T Frontage <br />The sidewalk along the Southwest side of Franklin Street will be widened between <br />Jefferson Avenue and Wilson Street. This widening will require removal and <br />replacement of sidewalk, curb, and gutter, street lights, and street trees. Existing <br />utility structures in the sidewalk and street in the area of the reconstructed sidewalk <br />will need to be adjusted to final grade. The existing traffic signal at the South corner <br />of the intersection of Franklin Street and Jefferson Avenue will be relocated to <br />facilitate construction of an ADA-curb ramp. An existing gas line is located in Franklin <br />Street. Widening of the sidewalk will place the gas line within the sidewalk and <br />potentially in the location of proposed street trees, street lights, and curb inlets. A <br />relocation of this gas line may be required to facilitate the sidewalk widening. <br /> <br />ATTY/AGR/2015.107/GREYSTAR - 103 WILSON - IA WITH TIF CREDIT <br />REV: 05-28-15 VR <br />Page 21 of 27 <br />7.1.D. - Page 57
The URL can be used to link to this page
Your browser does not support the video tag.