My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt15 West Yost
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2015
>
Agmt15 Under 60K
>
Agmt15 West Yost
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2015 9:38:14 AM
Creation date
6/10/2015 9:38:12 AM
Metadata
Fields
Template:
Agreement
Contractor Name
West Yost
PROJECT NAME
Inner Harbor Utilities Evaluation
RMP File Number
304.5
Date
6/2/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
, _ . �_ _ <br /> EXHIBIT "A" <br /> SCOPE OF SERVICES <br /> West Yost Associates (Consultant) will perform a scope of work includes a total of six <br /> tasks: four technical tasks to prepare the different utilities evaluations, a task to <br /> document findings in a technical report; and a task for meetings and project <br /> management. Project scoping assumes that potential potable and recycled water <br /> demands, sewer flows and storm drainage loadings will be provided by the City <br /> Planning Department, who is developing this information in collaboration with <br /> Fuscoe Engineering, a consultant working on the Specific Plan. Conceptual utilities <br /> plans, identified in Chapter 7 of the draft Specific Plan will be used as a starting point <br /> for analysis. <br /> The details of the scope of work are presented below. <br /> Task 1: Perform Water System Analysis <br /> In this task, Consultant will perform a potable water system analysis to determine <br /> infrastructure requirements to serve the Specific Plan Area. The following work will be <br /> performed: <br /> • Update the Hvdraulic Model: Update the City's existing hydraulic model to <br /> include conceptual pipelines identified in the draft Specific Plan, and allocate <br /> demands provided by the City for the various potential uses in the Specific <br /> Plan area. The City's Water System Master Plan identified a new storage <br /> tank in the vicinity of the Specific Plan area. In consultation with the City, <br /> incorporate the storage tank into the model at the appropriate location and <br /> size. <br /> • Calibrate the Model: Calibrate the model using the field hydrant flow test <br /> provided by the City to verify that the hydraulic model simulates the field test <br /> conditions. <br /> Consultant will perform up to finro fire flow test calibrations of the hydraulic <br /> model or up to four hours of model calibration. To ensure the hydrant flow <br /> test field conditions are accurately captured in the hydraulic model for <br /> calibration, the City will need to provide current pressure settings at the <br /> SFPUC turnouts that supply the City's Main Pressure Zone and the time of <br /> day that the tests were perFormed. Estimate zone demand based on <br /> seasonal and diurnal information developed for the Water Master Plan, since <br /> the City does not have the ability to estimate demand in the Main City <br /> Pressure Zone. Review the calibration results to determine if pipeline <br /> roughness coefficients that are assigned to pipelines within the Specific Plan <br /> area in the hydraulic model should be adjusted based on the calibration <br /> results. If the pipeline roughness coefficients at the Specific Plan area need <br /> ATTY/AGR/2015.095/WESTYOSTASSOCIATES—INNER HARBOR UTILITIES EVALUATION <br /> REV:05-13-15 VR <br /> Page 9 of 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.