Laserfiche WebLink
<br /> Public Highway Crossing 08/13/01 <br /> Standard Form Approved, A VP-Law <br /> e) All construction work of the Political Body shall be performed diligently and completed within a reasonable time, and in any event <br /> within three (3) years from the effective date of this Agreement. or within such further period of time as may be specified in vvriting by the <br /> Railroad's Vice President-Engineering Services. No part of the Project shall be suspended, discontinued or unduly delayed without the <br /> Railroad's written consent, and subject to such reasonable conditions as the Railroad may specify. It is understood that the Railroad's <br /> tracks at and in the vicinity of the work will be in constant or frequent use during progress of the work and that movement or stoppage <br /> of trains, engines or cars may cause delays in the work of the Political Body. The Political Body hereby assumes the risk of any such <br /> delays and agrees that no claims for damage on account of any delay shall be made against the Railroad. <br /> £) If the Project includes construction of a structure over which trains are to be operated, or for which the Railroad has any responsibility <br /> for maintenance, the Political Body shall furnish the Railroad permanent reproducible prints of all design and shop drawings as soon <br /> as possible after approval by the Vice President-Engineering Services of the Railroad or his authorized representative. Upon completion <br /> of construction, the Political Body shall furnish the Railroad two sets of "as constructed" prints and, in addition, upon request of the Vice <br /> President-Engineering Services of the Railroad, "as constructed" permanent reproducible prints of all or any portion of the structure. <br /> SECTION 3 -INJURY AND DAMAGE TO PROPERTY <br /> If the Political Body, in the performance of any work contemplated by this Agreement or by the failure to do or perform anything for <br /> which the Political Body is responsible under the provisions of this Agreement, shall injure, damage or destroy any property of the Railroad <br /> or of any other person lawfully occupying or using the property of the Railroad, such property shall be replaced or repaired by the Political <br /> Body at the Political Body's own expense, or by the Railroad at the expense of the Political Body, and to the satisfaction of the Railroad's <br /> Vice President-Engineering Services. <br /> SECTION 4 - PAYMENT FOR WORK BY THE RAILROAD COMPANY <br /> a) Bills for work and materials shall be paid by the Political Body promptly upon receipt thereof. The Railroad will submit to the Political <br /> Body current bills for flagging and other protective services and devices during progress of the Project. The Railroad will submit final <br /> billing for flagging and other protective services within one hundred and twenty (120) days after completion of the Project. provided the <br /> Political Body advises the Railroad of the commencement of the 120-day period by giving the Railroad written notification of completion <br /> of the Project. <br /> b) The Railroad may contract for the performance of any of its work by other than railroad forces. The Railroad shall notify the Political <br /> Body of the contract price within ninety (90) days after it is awarded. Unless the Railroad's work is to be performed on a fixed price basis, <br /> the Political Body shall reimburse the Railroad for the amount of the contract. <br /> SECTION 5 - MAINTENANCE <br /> a) If the Project involves a grade crossing: <br /> 1) The Political Body shall, at its own sole expense, maintain, repair, and renew, or cause to be maintained, repaired and renewed, <br /> the entire Crossing Area, except the portions between the track tie ends, which shall be maintained by and at the expense of the <br /> Railroad. <br /> 2) If, in the future, the Political Body elects to have the surfacing material between the track tie ends, or between tracks if there is <br /> more than one railroad track across the Crossing Area, replaced with paving or some surfacing material other than timber planking, <br /> the Railroad, at the Political Body's expense, shall install such replacement surfacing, and in the future, to the extent repair or <br /> replacement of the surfacing is necessitated by repair or rehabilitation of the Railroad's tracks through the Crossing Area, the <br /> Political Body shall bear the expense of such repairs or replacement. <br /> b) If the Project involves a public highway crossing under the Railroad's tracks: <br /> 1) The Political Body shall, at its own sole expense, maintain, repair, and renew, or cause to be maintained, repaired and renewed, <br /> the entire substructure of the highway-railroad grade separation structure. <br /> 2) The Railroad shall, at its own sole expense, maintain and repair, or cause to be maintained and repaired, the entire <br /> superstructure of the highway-railroad grade separation structure. <br /> c) If the Project involves a public highway crossing over the Railroad's tracks, the Political Body shall, at its own sole expense, maintain, <br /> repair, and renew, or cause to be maintained, repaired, and renewed, the entire highway-railroad grade separation structure. <br /> SECTION 6 - CHANGES IN GRADE <br /> If at any time the Railroad shall elect. or be required by competent authority to, raise or lower the grade of all or any portion of the <br /> track or tracks located on the Crossing Area, the Political Body shalL at its own expense, comorrn the public highway in the Crossing Area <br /> Page 2 Exhibit B <br /> To New Public Highway Crossing Agreement <br /> . <br />