Laserfiche WebLink
3) NORTH 51°14'15" EAST, 108.61 FEE ; (NORTH 52 041'47" EAST, 108.61 FEET) <br /> 4) NORTH 38°57'34" FAST, 50.04 FEET; (NORTH 39 055'06" EAST, 50.04 FEET) <br /> 5) NORTH 28°22'35" EAST, 107.06 FEET; (NORTH 29"20'07" EAST, 107.06 FEET) <br /> 6) NORTH 57°50'10" LAST, 79. 17 FEET; (NORTH 58°4142" EAST, 79.17 FEET) <br /> 7) SOUTH 77°03'52" EAST, 0.33 FEET; (SOUTH 76°06'20" EAST, 10.33 FEET) TO A POINT ON THE <br /> EASTERLY LINE OF SAID PARCEL ONE; <br /> THENCE ALONG SAID EASTERLY LINE, SOUTH 54°06'00" EAST, 255,07 FEET TO A POINT ON THE MEAN <br /> F IIGI I TIDE LINE OF REDWOOD CREEK AS SHOWN ON THAT CERTAIN RECORD OF SURVEY FILED <br /> ]ANUARY 7, 1960 IN VOLUME 4 OF LICENSED I. AND SURVEYORS MAPS AT PAGES 69 THROUGH 73, <br /> INCLUSIVE, IN THE OFFICE OF THE RECORDER OF THE COUNTY OF SAN MATEO, CALIFORNIA; THENCE. <br /> ALONG LAST SAID MEAN HIGH TIDE LINE THE FOLLOWING TWO COURSES (RECORD DATA SHOWN IN <br /> PARENTHESIS BELOW PER VOLUME 4 OF LICENSED LAND SURVEYORS MAPS AT PAGES 69 THROUGH <br /> /3): <br /> 1 ) SOUTH 48° 10'45" EAST, 15551 FEET; (SOUTH 47°13'05" EAST) <br /> 2) SOUTIl 52°41 '59" EAST, 90.23 FEET TO A POINT ON SAID EASTERLY LINE OF SAID PARCEL ONE; <br /> (SOUTH 51 °44'19" EAST) <br /> THENCE ALONG SAID EASTERLY LINE, SOUTH 46°24'00' EAST, 96.55 FEET TO THE. SOUTHEAST <br /> CORNER OF SAID PARCEL ONE, SAID POINT BEING ALSO THE NORTHEAST CORNER OF PARCEL TWO <br /> AS SAID PARCEL IS DESCRIBED IN SAID DOCUMENT NO, 94-194034 ; THENCE ALONG THE <br /> NORTHEASTERLY LINE OF SAID PARCEL TWO, SOUTH 46°24'00" EAST, 83.38 FEET TO A POINT ON <br /> LAST SAID MEAN HIGH TIDE LINE; THENCE ALONG LAST SAID MEAN HIGH TIDE LINE, THE <br /> FOLLOWING TWO COURSES: <br /> 1 ) SOUTH 10°46'49" EAST, 23.22 FEET; (SOUTH 09°49'09" EAST) <br /> 2) SOUTH 70° 18'08" EAST, 33,38 FEET TO A POINT ON SAID EASTERLY LINE or SAID PARCEL TWO; <br /> (SOUTH 69°20'28" EAST) <br /> THENCE ALONG SAID NORTHEASTERLY LINT OF SAID PARCEL TWO, THE FOLLOWING TWO COURSES: <br /> 1) SOUTH 46°24'00" EAST, 12.03 FEET; (SOUTH 46°24'00" EAST) <br /> 2) SOUTH 28°41'00" EAST, 203.51 FEET (SOUTH 28°41100" EAST) TO THE SOUTHEASTERLY CORNER <br /> OF SAID PARCEL TWO AS DESCRIBED IN SAID DOCUMENT; <br /> THENCE ALONG THE SOUTHERLY LINE OF SAID PARCEL TWO, SOUTH 81 °3035" WEST, 1112. 24 FELT <br /> TO THE SOUTHWEST CORNER OF SAID PARCEL TWO, AND THE TRUE POINT or BEGINNING. <br /> THE BEARINGS USED IN THE ABOVE DESCRIPTION REFER TO THE MERIDIAN EMPLOYED IN THE <br /> SWAMP AND OVERFLOWED LAND SURVEY NO. 1 , AS REFERENCED IN SAID DOCUMENT NO. 94-194034 . <br /> EXCEPTING THEREFROM ONE-SIXTEENTH OF ALL COAL, Oft, GAS AND OTHER MINERAL DEPOSITS AS <br /> RESERVED IN THE PATENT FROM THE STATE OF CALIFORNIA TO EARL P. WILSEY, RECORDED <br /> SEPTEMBER 8, 1930 IN BOOK 489 AT PAGE 355.SAN MATEO COUNTY RECORDS. <br /> FURTHER EXCEPTING THEREFROM THAT PORTION LYING BELOW THE MEAN HIGH TIDE LINE OF <br /> REDWOOD CREEK AS SHOWN ON THAT CERTAIN RECORD OF SURVEY FILED JANUARY 7, 1960 IN <br /> VOLUME 4 or LICENSED LAND SURVEYORS MAPS AT PAGES 69 THROUGH 73. INCLUSIVE, IN THE <br /> OFFICE OF THE RECORDER OF THE COUNTY OF SAN MATEO, CALIFORNIA. <br /> BEING ADJLIS I ED PARCEL TWO AS DESCRIBED IN THE LOT LINE ADJUSTMENT RECORDED OCTOBER <br /> 29, 2012 AS INSTRUMENT NO. 2012' 159103 OF SAN MATEO COUNTY OFFICIAL RECORDS. <br /> REV: 0611-15 VR <br /> Page 9 of 9 <br /> ATTY/AGR.2015. 114/Blu Harbor <br />