|
3) NORTH 51444115" EAS1 , 108.61 FEET; (NOR H 52°41'47" EAST, 108.61 FEET )
<br /> 4) NORTH 38°57'34" EAST, 50.04 FEED (NORTH 39 1155'06" EAST, 50.04 FEET)
<br /> 5) NORTH 28°22'35" EAST , 107,06 FEET; (NORTH 79070Q7" EAST, 107.06 FEET)
<br /> 6) NORTH 57°50' i0" EAST, 79.17 FEET; (NORTH 58°47'42" EAST, 79. 17 FEET)
<br /> 7) SOUTH 77°03'52" EAST, 10.33 FEET; (SOUTH 76°06'20" EAST, 10.33 FEET) TO A POINT ON THE
<br /> EASTERLY LINE OF SAID PARCEL. ONE;
<br /> THENCE ALONG SAID EASTERLY LINE, SOUTH 51°06'00" EAST, 255.07 FEET TO A POINT ON THE MEAN
<br /> HIGH TIDE LINE OF REDWOOD CREEK AS SHOWN ON THAT CERTAIN RECORD OF SURVEY FILED
<br /> JANUARY 7, 1960 IN VOLUME 4 OF LICENSED LAND SURVEYORS MAPS AT PAGES 69 THROUGH 73 ,
<br /> INCLUSIVE, IN THE OFFICE OF THE RECORDER OF THE COUNTY OF SAN MATEO, CALIFORNIA; THENCE
<br /> ALONG LAST SAID MEAN HIGH TIDE LINE THE FOLLOWING TWO COURSES (RECORD DATA SHOWN IN
<br /> PARENTHESIS BELOW PER VOLUME 4 OF LICENSED LAND SURVEYORS MAPS AT PAGES 69 THROUGH
<br /> 73);
<br /> 1 ) SOUTH 48°10'45" EAST, 155,51 FEET; (SOUTH 47° 13'05" EAST)
<br /> 7) SOUTH 52°91 '59" FAST, 90,23 FEET TO A POINT ON SAID EASTERLY LINE OF SAID PARCEL. ONE;
<br /> (SOUTH 51°44'19" EAST)
<br /> THENCE ALONG SAID EASTERLY LINE, SOUTH 46°29'00" EAST, 96.55 FEET TO THE SOUTHEAST
<br /> CORNER OF SAID PARCEL ONE, SAID POINT BEING ALSO THE NORTHEAST CORNER OF PARCEL TWO
<br /> AS SAID PARCEL IS DESCRIBED IN SAID DOCUMENT NO. 94- 194034; THENCE ALONG THE
<br /> NORTHEASTERLY LINE OF SAID PARCEL TWO, SOUTH 46°24'00" EAST, 83.38 FEET TO A POINT ON
<br /> LAST SAID MEAN HIGH TIDE LINE; THENCE ALONG LAST SAID MEAN HIGH TIDE LINE, THE
<br /> FOLLOWING TWO COURSES:
<br /> 1 ) SOUTH 10°4019" EAST, 23. 22 FEET; (SOUTH 09 049'09" EAST)
<br /> 2) SOUTH 70°18'08" EAST, 33.38 FEET TO A POINT ON SAID EASTERLY LINE OF SAID PARCEL TWO;
<br /> (SOUTH 69°2028" EAST)
<br /> THENCE ALONG SAID NORTHEASTERLY LINE OF SAID PARCEL TWO, THE FOLLOWING TWO COURSES:
<br /> 1) SOUTH 46°24'00" EAST, 12.03 FEET; (SOUTH 46°24'00" EAST)
<br /> 2) SOUTH 28°41'00" EAST, 203.51 FEET (SOUTH 28°41'00" EAST) TO THE SOUTHEASTERLY CORNER
<br /> OF SAID PARCEL TWO AS DESCRIBED IN SAID DOCUMENT;
<br /> THENCE ALONG THE SOUTHERLY LINE OF SAID PARCEL TWO, SOUTH 81 030'35" WEST, 1112,24 FEET
<br /> TO THE SOUTHWEST CORNER OF SAID PARCEL TWO, AND THE TRUE POINT OF BEGINNING.
<br /> THE BEARINGS USED IN THE ABOVE DESCRIPTION REFER TO THE MERIDIAN EMPLOYED IN THE
<br /> SWAMP AND OVERFLOWED LAND SURVEY NO. 1, AS REFERENCED IN SAID DOCUMENT NO. 94-194034 .
<br /> EXCEPTING THEREFROM ONE-SIXTEENTH OF ALL COAL, OIL, GAS AND OTHER MINERAL DEPOSITS AS
<br /> RESERVED IN THE PATENT FROM THE STATE OF CALIFORNIA TO EARL P. WILSEY, RECORDED
<br /> SEPTEMBER 8, 1930 IN BOOK 489 AT PAGE 355,SAN MATEO COUNTY RECORDS.
<br /> FURTHER EXCEPTING THEREFROM THAT PORTION LYING BELOW THE MEAN HIGH TIDE LINE OF
<br /> REDWOOD CREEK AS SHOWN ON THAT CERTAIN RECORD OF SURVEY FILED JANUARY 7, 1960 IN
<br /> VOLUME 4 OF LICENSED I_AND SURVEYORS MAPS AT PAGES 69 THROUGH 73, INCLUSIVE, IN THE
<br /> OFFICE OF THE RECORDER OF THE COUNTY OF SAN MATEO, CALIFORNIA,
<br /> BEING ADJUSTED PARCEL TWO AS DESCRIBED IN THE LOT LINE ADJUSTMENT RECORDED OCTOBER
<br /> 29, 2012 AS INSTRUMENT NO, 2012- 159103 OF SAN MATEO COUNTY OFFICIAL RECORDS.
<br /> REV: 06-12-15 VR
<br /> Page 9 of 9
<br /> ATTY/AGR.2015. 120/Blu Harbor
<br />
|