My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc 2015-075231 RWC HARBOR COMMUNITIES LLC_STMMA_07162015
RedwoodCity
>
City Clerk
>
Recorded Docs CC&Rs
>
Recorded Docs 2013-2020 Additional sub folders
>
Recorded Documents 2013-2023 (additional sub folders)
>
Stormwater Treatment Measure Agreements
>
RecDoc 2015-075231 RWC HARBOR COMMUNITIES LLC_STMMA_07162015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2015 5:24:52 PM
Creation date
7/17/2015 10:24:39 AM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Agreement
Subject
STMMA Blu Harbor
Doc Num
2015-075231
Rec Date
7/16/2015
Address
1 Uccelli Blvd
Parties
RWC Harbor Communities, LLC
MO Ref
15-102
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit C <br /> Bioretention Area Maintenance Plan Date of Inspection: <br /> Property Address: 1 Uccelli Boulevard Treatment Measure No.: <br /> Routine Maintenance Activities <br /> The principal maintenance objective is to prevent sediment buildup and clogging, which <br /> reduces pollutant removal efficiency and may lead to bioretention area failure. Routine <br /> maintenance activities, and the frequency at which they will be conducted, are shown in <br /> Table 1 . <br /> ... _. _.. Table 1 _... _.. . . <br /> Routine Maintenance Activities for Bioretention Areas <br /> No. Maintenance Task Frequency of Task <br /> 1 Remove obstructions, debris and trash from bioretention Monthly, or as needed after storm <br /> area and dispose of properly. events <br /> 2 Inspect bioretention area to ensure that it drains between Monthly, or as needed after storm <br /> storms and within five days after rainfall. events <br /> 3 Inspect inlets for channels, soil exposure or other evidence Monthly, or as needed after storm <br /> of erosion. Clear obstructions and remove sediment. events <br /> 4 Remove and replace all dead and diseased vegetation. Twice a year <br /> 5 Maintain vegetation and the irrigation system. Prune and Before wet season begins, or as <br /> weed to keep bioretention area neat and orderly in needed <br /> appearance. <br /> 6 Check that mulch is at appropriate depth (3 inches per soil Monthly <br /> specifications) and replenish as necessary before wet <br /> season begins. <br /> 7 Inspect bioretention area using the attached inspection Monthly, or after large storm events, <br /> checklist. and after removal of accumulated <br /> debris or material <br /> II. Prohibitions <br /> The use of pesticides and quick release fertilizers shall be minimized, and the principles of <br /> integrated pest management (IPM ) followed: <br /> 1 . Employ non-chemical controls (biological, physical and cultural controls) before using <br /> chemicals to treat a pest problem. <br /> 2. Prune plants properly and at the appropriate time of year. <br /> 3. Provide adequate irrigation for landscape plants. Do not over water. <br /> 4. Limit fertilizer use unless soil testing indicates a deficiency. Slow-release or organic <br /> fertilizer is preferable. Check with municipality for specific requirements. <br /> 5. Pest control should avoid harming non-target organisms, or negatively affecting air and <br /> water quality and public health. Apply chemical controls only when monitoring indicates <br /> that preventative and non-chemical methods are not keeping pests below acceptable <br /> levels. When pesticides are required, apply the least toxic and the least persistent <br /> pesticide that will provide adequate pest control. Do not apply pesticides on a <br /> prescheduled basis. <br /> 6. Sweep up spilled fertilizer and pesticides. Do not wash away or bury such spills. <br /> 7. Do not over apply pesticide. Spray only where the infestation exists. Follow the <br /> manufacturer's instructions for mixing and applying materials. <br /> 8. Only licensed, trained pesticide applicators shall apply pesticides. <br /> 9. Apply pesticides at the appropriate time to maximize their effectiveness and minimize <br /> the likelihood of discharging pesticides into runoff. With the exception of pre-emergent <br /> pesticides, avoid application if rain is expected. <br /> 10. Unwanted/unused pesticides shall be disposed as hazardous waste. <br /> Page 2 <br /> ATTY/AGR'2015.120/Btu Harbor <br />
The URL can be used to link to this page
Your browser does not support the video tag.