My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2015-07-27 Joint SA and PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2015
>
AgdaPkt 2015-07-27 Joint SA and PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2015 8:35:10 AM
Creation date
7/23/2015 5:51:54 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
7/27/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
895
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.A. - Page 21 <br /> filing. All tree removal and trimming shall take place outside of the breeding season. <br /> [COA][PLANNING] <br /> 24. Tree Removal Permit - The applicant shall obtain a Tree Removal Permit application <br /> to the City's Landscape Architect for review and approval prior to the removal any trees <br /> on the subject property or along the Project's three street frontages. [SDR][PLANNING] <br /> 25. Stormwater Runoff - Post - construction runoff into the storm drain shall not exceed pre - <br /> construction runoff levels. The applicant's design professional shall evaluate the <br /> project's impact to the City's storm drainage system and shall substantiate their <br /> conclusions with drainage calculations to the satisfaction of the City Engineer. The <br /> project shall be designed in conformance with the Drainage Guidelines for Commercial <br /> Development. [SDR][ENGINEERING] <br /> 26. Exterior Lighting — New exterior lighting requires final review by the City prior to <br /> building permit issuance. As part of the Building Permit submittal package, the applicant <br /> shall provide a lighting plan including cut - sheets for all new fixtures, as well as <br /> photometric evaluation site plan demonstrating that light levels are appropriate for the <br /> use and that the new light sources do not introduce glare or light effects that spill off the <br /> property. [COA][PLANNING] <br /> 27. Bicycle Parking — The amount of required, long -term bicycle parking shall be <br /> determined by the amount of required vehicle parking (regardless of whether it is <br /> provided on site or via payment of the in -lieu fee) for the project. Up to 20% of the <br /> required spaces may be provided on the adjacent sidewalk for use as short -term bicycle <br /> parking. The remainder must be provided onsite, in a secure location for long -term <br /> parking. [COA][ENGINEERING] <br /> 28. Outdoor Structures and Uses — Any outdoor structures or uses not identified with this <br /> project require separate review and approval by the City prior to installation of structures <br /> or commencements of uses. The outdoor tables, chairs, umbrellas and other outdoor <br /> structures in the right -of -way have been reviewed by the City in concept only and require <br /> further review. Prior to the installation of any outdoor structures or commencement of <br /> uses in the right -of -way, the applicant shall submit detailed plan to the City. A Sidewalk <br /> Cafe Permit may be required for outdoor dining uses. [SDR][PLANNING] <br /> Parcel Map <br /> 29. Applicable Codes — The applicant shall adhere to the Subdivision Map Act and Chapter <br /> 30 of the City's Municipal Code. <br /> 30. Right -of -Way (ROW) Vacation - The proposed ROW Vacation of the Sliver Parcel on <br /> Winslow Street shall be completed prior to the approval of the Final Map. <br /> 31. Parcel Map - Prior to Building Permit issuance, a Parcel Map for the property shall be <br /> recorded. The Parcel Map shall include the merging of all the lots into one lot, and shall <br /> include any proposed easements. [SDR][ENGINEERING] <br /> 32. Agreements - Prior to Parcel Map approval, the applicant shall enter into the following <br /> agreements in a form acceptable to the City Attorney: [COA][ENGINEERING] <br /> Page 8 of 20 <br /> ATTY /RESO.3115 /CC RESO APPROVING TM, DPC, PARKING IN -LEU <br /> REV: 07 -17 -15 VR <br />
The URL can be used to link to this page
Your browser does not support the video tag.