Laserfiche WebLink
8.A. - Page 23 <br /> 38. As- Builts — The applicant shall provide "as- built" or "record" drawings prepared by a <br /> Civil Engineer, to be submitted in paper, and /or PDF formats. <br /> 39. Field Survey Data — The applicant shall provide all field survey data to permit retracing <br /> all survey monuments set to establish the street right -of -way, both public and private, in <br /> AutoCad format prior to issuance of the building permit. <br /> Utility Infrastructure Improvements <br /> 40. Conformance with the City's Engineering Standards — All public improvements shall <br /> be designed and constructed in accordance with the City's Engineering Standards. <br /> [SDR][ENGINEERING] <br /> 41. Encroachment Permits — All utilities shall be designed in accordance with the City's <br /> Engineering Standards. The applicant shall obtain Encroachment Permits from the <br /> Community Development Department prior to the commencement of construction of the <br /> road, utilities, and /or any site improvements for the following: [SDR][ENGINEERING] <br /> a. work in the City public right -of -way, easements or property in which the City <br /> holds an interest <br /> b. if a grading permit is required. A Plot and Finished Grading Plan prepared by <br /> a California registered Civil Engineer is required with a grading permit. <br /> c. if on -site shoring is proposed <br /> d. use of the public right -of -way for any fixed structure (awnings, roof overhangs, <br /> fixed planters, etc.) and provide insurance meeting with the City's <br /> requirements. This permit sill be recorded against the property. <br /> 42. Shoring — The applicant shall obtain an encroachment permit for any shoring which <br /> affects the public right of way. No tiebacks shall extend into the public right of way or <br /> onto adjacent private properties without the written consent of the City Engineer and /or <br /> the private property owner. Any tie -backs within the City's right of way shall be de- <br /> tensioned prior to permit sign -off and /or project acceptance. [COA][ENGINEERING] <br /> 43. Undergrounding Utilities - This project requires the undergrounding of all overhead <br /> utilities. The undergrounding shall be shown on the building permit plans. <br /> [SDR][ENGINEERING] <br /> 44. Sewer Capacity — The applicant shall submit a report demonstrating that the existing <br /> sewer mains have sufficient capacity for the project. The study shall consider existing, <br /> project, other approved projects, and applications currently under review in determining the <br /> needed capacity. If the existing sewer main is not sufficient as determined by the City <br /> Engineer, applicant shall, as part of the Project, construct and install new sewer mains <br /> sufficient to meet such requirements, in accordance with the City's Engineering standards <br /> and as directed by the City Engineer to the City Engineer's satisfaction. <br /> [SDR][ENGINEERING] <br /> a. For new or remodeled commercial buildings, sewer laterals less than 4" shall <br /> be upgraded to a minimum 6" size. <br /> Page 10 of 20 <br /> ATTY /RESO.3115 /CC RESO APPROVING TM, DPC, PARKING IN -LEU <br /> REV: 07 -17 -15 VR <br />