Laserfiche WebLink
8.A. - Page 28 <br /> and shall adhere to the City's Noise Ordinance. If possible, the noisiest construction <br /> activities would be scheduled for daytime hours when the ambient noise levels are <br /> highest. [SDR][BUILDING] <br /> 65. Pre - Meeting for Construction - After City permits are approved, but prior to start of <br /> construction, the applicant shall hold a preconstruction conference with Engineering <br /> staff and other interested parties. The developer shall arrange for the attendance of the <br /> construction manager, contractor, and all subcontractors who are responsible for <br /> grading and erosion and sedimentation protection controls. [COA][ENGINEERING] <br /> 66. Construction Material in the Right -of -Way - Construction parking, material storage, <br /> equipment, or other construction - related uses are not allowed within the City right of <br /> way without prior approval from the City Engineer. Prior to encroachment permit <br /> issuance, the applicant shall submit a construction parking management plan, which <br /> shall outline the number of construction workers by phase, phase duration, where <br /> parking will be located for each phase. [COA][ENGINEERING] <br /> 67. Construction & Traffic Control Plan — The applicant shall submit a Construction <br /> Traffic Routing and Parking Plan for review and approval prior to the issuance of permits. <br /> The plan shall ensure that adequate emergency access is maintained during <br /> construction. Traffic control for lane closures shall conform to the Work Area Traffic <br /> Control Handbook. Street closures require submission of traffic control plans and <br /> approval in advance. [SDR][ENGINEERING] <br /> 68. Grading — Grading shall be performed in accordance with Volume III, Part II of the City's <br /> Engineering Standards. Soil or other construction materials shall not be stockpiled in <br /> the public right -of -way. The applicant shall submit cut/fill volumes (CY) for all soils to <br /> be imported to or exported from the site. [SDR][ENGINEERING] <br /> 69. Monitoring - The Soils Engineer shall conduct continuous site inspections during <br /> trenching and backfill operations at the applicant's expense. The Soils Engineer shall <br /> take compaction tests and submit the results to Engineering & Construction. <br /> [SDR][ENGINEERING] <br /> 70. Public Parking During Construction - The applicant shall apply for Parking Meter <br /> Construction Zone Hoods prior to removing any public parking spaces from public use <br /> during construction. Parking meter construction zone hoods shall be issued upon <br /> payment of a deposit of $10.00 per hood issued, refundable upon return of the hoods, <br /> and a nonrefundable fee of $3.00 per day per hood issued. [SDR][ENGINEERING] <br /> 71. Construction Coordination — The applicant shall coordinate the proposed design with <br /> other developments in the area, especially at conform locations, in order to provide a <br /> consistent design for the overall area. The applicant shall coordinate construction <br /> sequencing to the maximum extent practicable to provide for smooth transitions <br /> between adjacent projects during all phases of construction, to reduce impacts to public <br /> access (vehicular and pedestrian) during construction, and to avoid reconstruction of <br /> recently constructed improvements. [SDR][ENGINEERING] <br /> 72. Construction Noise — The applicant shall comply with the following construction - period <br /> noise abatement measures: [SDR][BUILDING] <br /> Page 15 of 20 <br /> ATTY /RES0.3115 /CC RESO APPROVING TM, DPC, PARKING IN -LEU <br /> REV: 07 -17 -15 VR <br />