Laserfiche WebLink
7.1.D. - Page 29 <br /> SPECIFICATIONS <br /> a. Install split face block planter with bullnose cap, install irrigation or synthetic <br /> plants as shown. <br /> b. Install new walkway the entire frontage of the building from corner to corner. <br /> Walkway to have a 2 -foot smooth border with a salted finish inside. Walkway <br /> 10 -feet wide as existing. <br /> c. Add ADA ramp on walkway and eliminate step at front of building. <br /> ESTIMATED COST: $55,000 <br /> RENOVATE 800 SF OFFICE SPACE <br /> NM <br /> ATTY /AGR /2015.137/STATE OF CALIFORNIA — MILITARY DEPARTMENT <br /> REV: 07 -08 -15 MLG <br /> Page 26 of 29 <br />